20060831165313.pdfo� EDS City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
Fsr aqo (425) 771-0220
DATE: August 31, 2006
TO: Steve Hansen
1060 Spruce St
Edmonds, WA 98020
FROM: Jenny Readwin, Plans ECf
RE: Plan Check 4 2006-0923
Project: Addition
Project Address: 1060 Spruce St.
During re -review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents (affected sheets only) with a written response to each of the items below to a
Permit Coordinator.
1) ok
2) Specify nailing of (5) 2x10 beam above the basement near the stair. Provide complete gravity
(beam) calculations for all proposed beams and headers.
3) ok
4) Specify foundation supporting the triple studs carrying down the middle of the ridge beam
down to the existing 6x6 posts to verify that the existing foundation is adequate to carry
additional loads. Add all foundation information to the basement plan to show how all loads are
being carried to bearing. There are some posts that do not show anything supporting them.