Loading...
20060845 old milltown disruption fees.xls SIDEWALK DISRUPTION/CLOSURE FEE CALCULATION Old Milltown201 5th Ave S Project/Address: calculated byALCDate:8/18/2006 Bars#:111.000.000.344.130.000.000.00 Assessed Land value (per County Assessor) $ 638,300.00 of abutting property 190130 Area of abutting property (sf) # (divided by) 24,700 sf per square foot Assessed land value of abutting property (land value divided by area of property) (equals)$ 25.84per sf disruption/closure multiplier 0.01 (1%) (times) 1% of assessed land value per square foot (equals)$ 0.26per sf (land value per sf x disruption multiplier) Sidewalk area disrupted in square feet 8320 ft wide xft long = (times)2560sf Monthly sidewalk disruption fee $ 661.56 (1% land value per square foot x area of sidewalk disrupted)(equals)per mo. 12 Estimated number of months of disruption (times) SUBTOTAL SIDEWALK DISRUPTION/CLOSURE FEE $ 7,938.69 (equals) $ 140.00 ADMINSTRATIVE PROCESSING FEE (plus) (fee to be paid prior to permit issuance). TOTAL FEE$ 8,078.69 (equals) NOTE: The above fee must be paid prior to or at the time of permit issuance. If actual months (or portion thereof) of disruption is more or less, then a fee adjustment will be made at the time of Engineering final inspection. as of 23 Apr 03v:\\mstr forms\\disruption-closure fees