Loading...
20060845 old milltown Revision-GI & DCDA.pdf Old Milltown - Renovation City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Comments Application: Date:January 2, 2008 # bld20060845 th Project Name/Address: Old Milltown/201 5 Ave S - Grease Interceptor and DCDA Relocation Contact Person/Address/Fax: : Ralph Allen / e-mail: rwallen@gracearchitectspllc.com Reviewer: Division: Jeanie McConnell Engineering The resubmittal for the subject application has been reviewed but cannot be completed until the following items have been addressed/corrected. Please provide a written response to each item and resubmit 3 sets of revised drawings to Theresa Umbaugh, Permit Coordinator. 1.The civil plans were not updated to show the new DCDA location and any changes, if any, to the location of the tie in at the City main. The relocation of the DCDA will be reviewed under the civil plans. Please revise and resubmit. 2.All plan revisions shall be clouded with an associated revision number. 3.The DCDA vault, per City standard details E7.8 and E7.8.1, is intended for application on the exterior of the building. The proposed location, as shown per the Architectural plans, is on the interior of the building. The vault will not be approved in the proposed location. Some of the concerns with this application include: lighting, drainage, replacement and accessibility. Please revise the plans to show a configuration similar to what was originally approved or with the vault location on the exterior of the building on private property. 4.The civils have been revised with regards to the grease interceptor location. Please show, revise or provide the following: a.Show separate lines to each kitchen facility for connections directly to the the sanitary sewer line and connections directly to the grease interceptor. The only waste lines connected directly to the sewer at this time appear to be the bathroom facilities. b.Show the connection of the outfall line from the grease interceptor to the 8” sewer line within the building. c.The sewer line for the new public restrooms and the existing tenant spaces on the south end of Old Milltown run through the same area as the proposed sewer line to the grease interceptor. Provide invert elevations and additional information as needed to show there is no conflict between these lines or revise the plans accordingly. 1 of 1 DATE E-MAILED 1/2/08 PAGE(s)