Loading...
2006-0877_SchliepsSFR.doc CE ITY OF DMONDS th 121 5 Avenue North • Edmonds, WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.ci.edmonds.wa.us DSD: P•E•B EVELOPMENT ERVICES EPARTMENTLANNING NGINEERING UILDING Plan Review Comments – Planning Division BLD-2006-0877(First Review) Plan Check #: Mark Schlieps SFR Project Name: th 7415 179 Street SW (RS-8 Zone) Project Address: September 12, 2006 Mark Schlieps th 11230 29 Avenue SW Seattle WA 98146 Phone: 206.491.9386 / Fax: (call first) 206.244.1776 / Email: none given Dear Applicant, I have reviewed the above building permit application for the Planning Division and it was found that the following information, corrections, or clarifications will need to be addressed before review can continue: Shed: 1. The shed shown on the site plan does not meet setbacks and must be moved/removed. Please note your intentions on the site plan. Retaining Wall Height: 2. Retaining walls over three feet in height (as measured from the top of the wall to the original grade) are considered a “structure” and are not permitted in the setback area. Please provide the top wall elevations so they it be compared to the original grade for height verification. If it looks like the walls are going to exceed three feet in the setback area, please revise your plans accordingly to meet code. Tree Plan: 3. Thank you for submitting a Tree Plan. However, it did not show any trees - neither existing nor to be removed. Please revise the Tree Plan to show the trees you intend to keep and those to be removed. Note that clearing on a slope of 25% or greater requires tree removal review. Generally, if the trees that are proposed to be removed are on/near the proposed building footprint that is going to be okay. Other trees outside this area will be reviewed because the intent is to preserve trees on slopes exceeding 25%. Grading: 4. Thank you for providing a grading plan. The “Grading Plan” shows 194 cyds of cut and 118 cyds of fill, while the “Height Plan” shows 272 cyds of cut and 151 cyds of fill. Please revise to make the figures on these plans consistent. Please also note that if grading exceeds 500 cubic yards of either cut or fill, then SEPA is triggered and an Environmental Checklist will be required. I would be happy to go over this process with you if you have any questions. Setbacks: 5. Thank you for showing the building setback line on the site plan. However, in the RS-8 zone, the rear setback is only 15 feet and you have shown 25 feet on the site plan. If you are going to be updating the site plan anyway, please revise the rear yard setback. Thank you for your cooperation. Please redline plans or submit three sets of revised plans/documents (affected sheets only) with a written response to each of the above items. Please make all submittals to the Development Services Permit Coordinator (Marie Harrison) Monday through Friday, 9am to noon or 1pm to 4pm. If you have any questions, please do not hesitate to contact me at (425) 771-0220, extension 1778. I look forward to working with you on this project. Sincerely, CITY OF EDMONDS Gina Coccia, Planner Page 1 of 1