Height Calculation/Grading Verification Worksheet
Address: Permit #: -22
Date:. 7
A. Datum Point: Rim z
9 t I
B. Datum Point Elevation: C-4: 0
F1
C. Average Grade:
55
For rading
nficatiori:0ril')
Y,
J.. Uive8t'P6otiag Ele�bition (sh6wri'oh &dmg Ofan��
2.
a X
m
C 0 1,
m 0
0
C
In
m z
on
3. Maximum Elevation Allowed:/21-nL (average grade) + 25' n
In m
4. Reference Point Elevation Shot to House: C) Vi
0 r-
0 m
(datum elevation) +2 3 -0—/ (grade to transit level line shot to house) a C4
K to
M 0
6. Measurements from line shot onto house to roof ridge: Z
;U
z
X
z
0
m
Total:-
7. Actual Eleva�e:/-4—' (reference point elevation) +Z3L�(---urements from
#6)
Conclusign:
1,57- (actual) is greater les than therefore the house I.,/
is not over the height requirera�t per ECDC 16.20.30 requirements
LUEMABUILDINGWISCHeight CalculationGrading Verification Workshect.doc
8012
240TH ST S. W!tECEIVED
MAY 18 2007
PERMIT COUNTER
240th St., 5
_�71±2L
NaW0121"E OF E
- ---4 — —THEFd,—
lo: HLREBY PEDICATED1, T JDMONDS 10.01'
71.62'
N8
.81, '20-ow-
Pr A
z
131.6
0
M
J,
8, 103 S.f.
0
OPT D---
/c
J21.9
m M,
-4- N8WO6'21 T
0.
jo-4
I Delta--90'
Delfa� ':320
)4-R , .00
x1l
.42
L=31:42 3,143 S.F.
PRIVATE
ROAD
4 :t IQ N8ri5'14 E ui
m M
CD
0
-�0.00
io.60 't — 30.00'
o
c: C/)
(n
c 0)
M 0
z
HEIGHT
CALCULATION
PT. A = 131.6
PT. 8 = 127.4
Pr. C - 121.9
Pr. D - 129.8
510.7 4 127.68 25' (,�;68
GARY HAAKENSON
CITY OF EDMONDS MAYOR
12t STHAVENUE NORTH - EDMONDS, WA98020 - (425) 771-0220 FAX (425) 771-0221
Websile: �6,edrrionds —us
DEVELOPMENT SERVICES DEPARTMENT
9'� Planning - Building - Engineering
May 8, 2007
Falcon Ridge Homes, LLC
z
Fax (866) 312-8468
0
0
RT
Re: Height Survey for Permit BLD2006-0924 at 8012 24011, Street SW
=i
The City received a height survey stamped by David G. West Jr., Surveyor and
0 M
C
upon review it appears his survey is based on finished grades. Height
M
-4 0
calculations are required to be calculate based on original grades as shown on the
0 C
approved site plan (ECDC 21.40.030). Based on the height calculations shown on
the approved site plan the maximum allowable height is 151.75. Note the survey
M Z
0-4 f"
is showing actual height at 152.68 which is presumably still over the maximum
C: —
:,1 z
allowable height since the surveyor used the same datum point from which the
CD
approved height calculations were based.
0""
In order to resolve this issue instruct your surveyor to re -shoot height based on
3:9
ra M
city approved height calculations or acknowledge that the building is 11.6" over
0,
091
height and provide revised plans to show how the roof framing will be altered to
C
C co
met the maximum allowed height. Contact Gina Coccia in Planning if you have
M 0
z
questions regarding the city's height codes and/or variance criteria.
i r 'y'
>
z
+ne
J R adw In
y i
z
P a., Examiner
M
Incorporated August 11, 1890
Sister City - Heldnan, Japan
Height Calculation/Grading Verification Worksheet
Address: A/Z — 2,�O
Permit
Date:
A. Datum Point: 1516
z
B. Datum Point Elevation: zz�
0
:4-
0
M
C. Average Grade:
'A
Vi 3:
In
Oor:dradinq rinc ioo-
m 0
F
I. LO st'j ting Elevation:(shmiVit'6rigia
80
C
-4 C
m
Actual Fgpting)Eipvatipn:
m z
z
3. Maximum Elevation Allowcd:/22-'—��--(average grade) + 25'=
0 -n
n
X
M
4. Reference Point Elevation Shot to House:
M
Ui
0
(datum elevation)+ (grade to transit level line shot to house)
0
C: In
CO
M 0
6. Measurements from line shot onto house to roof ridge:
Z
z
X
z
0
0
Fri
Total
7. Actual Elevatipn,'44Z� 4- (reference Point elevation)
#6) = 7/
IUE(-easurernents from
-7
Concl usi n:
,r,?
(actual) is greaterff/1e)s than 69(allOwed); therefore the house is/
is not over the height requiremielft-per E6 C 16.20-30 requirements
L'TEMABUILDINGNISOHeight CalculationGrading Verification Worksheet.doc
8012 240TH ST S. W.
71 2*
N88-0
_f2l t,-oi E '40N 10.01,
—1 �E ;lUlElit
JTEOY
>10.01' WT. 54.81
-,�. I I - 20.OW-
-96�
PT A
132— 57B4
:oj
0
rn
r
130
J*
8, 1 OA3� Sq F
00 Zn co
0 M
va m
0
0
121.9 j 9 8 c
OD Ix �i-- 1 --4 c
P12T N88*06'21 *E
m
0.56'
N 06'2 =90,
916,1AB I Delta
Delta.-O R=20.00 Z,
R-=10.00 L=31-42
3,14]l S.F.
L=31.42 V
PRIME 0 -n
41 (t. ROAD
4
o N8715'1� E wi
60.00
In m
_io u V)
07 50:ao,
0
or-
"T.
M 0
z
HEIGHT CALCULATION
0
PT. A = 131.6 -4
0
PT. 9 = 127.4 m
PT. C - 121.9
Pr. D - 129.8
510.7 / 4 = 12Z68 + 25' 152.68
B JLJ L 0 E P I
Height Calculation Worksheet
Date
Permit Number c?w (0'. C)
Address &Old
[nspector__YjAj,
Average Grade 1 016, 7
-75
z
0
Max Reight (25'-I-Ave.) 1
0
Actual Reight(A+13+C)
Ri
M
C
M 0
3
M:
0
"n
=(C -7-
M M
0
0 M
C (n
M
z
z
z
0
Elevation of transit above Datum (B)
M
Datum Elevation (A) /0
L/temp/building/foans/height worksheet
'77777""
city offowfi is
low -
Certftif ate qt oagpancy
DEPARTMENT OF BUILDINGS
PER INTERNATIONAL RESIDENTIAL CODE SECTION R1 10
AT: 8012 240" St SW Building Permit #: 2006-0924
occupancy established by this certificate: R3 Dwelling Units:
No. Stories: 2 Basement: NIA Type of Construction:
Owner of building: Falcon Ridne Homes, LLC.
The Single Family Residence at 8012 240". St SW as been inspected and approved complying with the requirements
of the 2003 edition of the International Residential Code as adopted by the City for the group and division of occupancy and the use for which
the proposed occupancy is classified.
Issued this 31" day of October, 2007
Chief Building Official
By:_
Any change of occupancy or use requires a building permit and a new Certificate of occupancy Issued by the City of Edmonds Building Official.
Permit Inspection Details
Permit: BLD20060924
PERMIT
1001 - E-Eroslon Control/Mobilization
complete?
1210412006 Hawkins 15 TESC per City's standards.
Y
Total Time:
15
1013 - E-Storm Tightline
Comolete?
12/20/2006 Hawkins 15 ok to h/f the t/I
y
Total Time:
is
1014 - E-Storm Connect to Stub
complete?
y
12=12006 Hawkins 15 ok to b1f the storm connection.
y
Total Time:
15
1017 - E-Footing Drain Connection
Completa7
Z
12/2012006 Hawkins 15 fooling drain connection is okto b1f.
y
Total Time:
15
1034 - E-Water Service Line
Complete?
10129/2007 Hawkins 0 Testect Okay to final.
y
Total Time:
0
�5 -4
Y'�
X
1077 - E-Engineering Final
'Complete?
m
C
1012912007 Hawkins 0 Ok.ylofinal.
y
In
Total Time:
0
--1
00
1106 - B;Setbacks
comp ate
Y
C
--I
3: m
11 1 /22/2006 Snook 25 SETBACKS APPROVED PER STRUNG PROPERTY LIMES
y
In Z
Total Time:
25
1108 - S-Footings
Comolelte?,
C
:1, Z
1112212006 Snook 25 APPROVED
y
Total Time:
25
CA
1110 -A-Foun dation Wall
complete?
0
n
12106/2006 Snook 25 APPROVED
Total Time:
25
m m
1116 - B-Slabinsulation
Complete?.
0
12119/2006 Snook 20 APPROVED
Y
0
C
Total Time:
20
-
In 0
1120 �e�Plumb Ground Work
completO
Y
Z f-
04/11/2007 Snook 25 APPROVED
Total Time:
25
11 �� "B-First Floor Framing
Complete?.
0 . 5131/2OG7 Snook 30 APPROVED
Y
Z
Total Time:
30
-4
3:
1126 - B.Plumb Rough In
Complete'�'
04/11=67 Snook 25
y
Z
Total Time:
25
1128 - B-Gas TestlPipe
complete!
m
03/29/2007 Snook 25 APPROVED
y
Total Time:
25
1132-B-Exterlor Sheathing
Complete?
03/26/2007 Snook 25 APPROVED
y
Total Time:
25
1136 - B-Shear Nailing
Complete?
Y,.
05/31/2007 Snook 30 APPROVED
y
7/9/2009 9:29:37 AM
Page I of 2
Total Time:
30
corilip ete
05/02/2007 Snook
6o CORRECTION NOTICE WRITTEN'
N
05129/2007 Readwin
30 HEIGHT APPROVED PER SURVEY AND LETTER DATED MAY 17,2007 BY DAVID G
y
WEST PROFESSIONAL LAND SURVEYOR (ATTACHED)
Total Time:
so
1114V� B-Firalming
05 /31/2 007 Snook
30 APPROVED
Y
Total Timet
30
1144 ",BmWall Instilattion/Caulk
60M 14jej,
P
05131/2007 Snook
30 APPROVED
y
Total Time:
30
114 -'&wFi6or1nSU1at10n1Cau1k
z
05/31/2007 Snook
30 APPROVED
y
0
Total Time:
30
0
B Ckilliniinsulation/Caum,�
C
10125/2007 Readwin
APPROVED
y
Total Time:
20
kN H
6et c a,
!n5
0 letew�.,�,
3: v
M
C
06/1212007 Readwin
30 INSPECTED AND APPROVED
y
M 0 E,
Total Time:
30
0
0
-t;B6iidihg-,F1nal,,'
e
C
. ..... .. ..
10126aiW... 9saiwin
20 WROTE CORRECTION
N
3: M
M Z
1W29/2007 TEMP-
0 APPROVED, PENDING END APPROVAL.
y
10-1 t'L
NATOLA
Total Time:
20
>
Total Inspections: 25
Total Time:
565
Oil
n
M M
0 r
C
091
M CD
111 0
Z
z
z
0
0
IT!
7/912009 9:29:37 AM
Page 2 of 2