Loading...
20060924.pdfRECEIVED MAY 18 2007 PERMIT COUNTER Height Calculation/Grading Verification Worksheet Address: Permit #: -22 Date:. 7 A. Datum Point: Rim z 9 t I B. Datum Point Elevation: C-4: 0 F1 C. Average Grade: 55 For rading nficatiori:0ril') Y, J.. Uive8t'P6otiag Ele�bition (sh6wri'oh &dmg Ofan�� 2. a X m C 0 1, m 0 0 C In m z on 3. Maximum Elevation Allowed:/21-nL (average grade) + 25' n In m 4. Reference Point Elevation Shot to House: C) Vi 0 r- 0 m (datum elevation) +2 3 -0—/ (grade to transit level line shot to house) a C4 K to M 0 6. Measurements from line shot onto house to roof ridge: Z ;U z X z 0 m Total:- 7. Actual Eleva�e:/-4—' (reference point elevation) +Z3L�(---urements from #6) Conclusign: 1,57- (actual) is greater les than therefore the house I.,/ is not over the height requirera�t per ECDC 16.20.30 requirements LUEMABUILDINGWISCHeight CalculationGrading Verification Workshect.doc 8012 240TH ST S. W!tECEIVED MAY 18 2007 PERMIT COUNTER 240th St., 5 _�71±2L NaW0121"E OF E - ---4 — —THEFd,— lo: HLREBY PEDICATED1, T JDMONDS 10.01' 71.62' N8 .81, '20-ow- Pr A z 131.6 0 M J, 8, 103 S.f. 0 OPT D--- /c J21.9 m M, -4- N8WO6'21 T 0. jo-4 I Delta--90' Delfa� ':320 )4-R , .00 x1l .42 L=31:42 3,143 S.F. PRIVATE ROAD 4 :t IQ N8ri5'14 E ui m M CD 0 -�0.00 io.60 't — 30.00' o c: C/) (n c 0) M 0 z HEIGHT CALCULATION PT. A = 131.6 PT. 8 = 127.4 Pr. C - 121.9 Pr. D - 129.8 510.7 4 127.68 25' (,�;68 GARY HAAKENSON CITY OF EDMONDS MAYOR 12t STHAVENUE NORTH - EDMONDS, WA98020 - (425) 771-0220 FAX (425) 771-0221 Websile: �6,edrrionds —us DEVELOPMENT SERVICES DEPARTMENT 9'� Planning - Building - Engineering May 8, 2007 Falcon Ridge Homes, LLC z Fax (866) 312-8468 0 0 RT Re: Height Survey for Permit BLD2006-0924 at 8012 24011, Street SW =i The City received a height survey stamped by David G. West Jr., Surveyor and 0 M C upon review it appears his survey is based on finished grades. Height M -4 0 calculations are required to be calculate based on original grades as shown on the 0 C approved site plan (ECDC 21.40.030). Based on the height calculations shown on the approved site plan the maximum allowable height is 151.75. Note the survey M Z 0-4 f" is showing actual height at 152.68 which is presumably still over the maximum C: — :,1 z allowable height since the surveyor used the same datum point from which the CD approved height calculations were based. 0"" In order to resolve this issue instruct your surveyor to re -shoot height based on 3:9 ra M city approved height calculations or acknowledge that the building is 11.6" over 0, 091 height and provide revised plans to show how the roof framing will be altered to C C co met the maximum allowed height. Contact Gina Coccia in Planning if you have M 0 z questions regarding the city's height codes and/or variance criteria. i r 'y' > z +ne J R adw In y i z P a., Examiner M Incorporated August 11, 1890 Sister City - Heldnan, Japan Height Calculation/Grading Verification Worksheet Address: A/Z — 2,�O Permit Date: A. Datum Point: 1516 z B. Datum Point Elevation: zz� 0 :4- 0 M C. Average Grade: 'A Vi 3: In Oor:dradinq rinc ioo- m 0 F I. LO st'j ting Elevation:(shmiVit'6rigia 80 C -4 C m Actual Fgpting)Eipvatipn: m z z 3. Maximum Elevation Allowcd:/22-'—��--(average grade) + 25'= 0 -n n X M 4. Reference Point Elevation Shot to House: M Ui 0 (datum elevation)+ (grade to transit level line shot to house) 0 C: In CO M 0 6. Measurements from line shot onto house to roof ridge: Z z X z 0 0 Fri Total 7. Actual Elevatipn,'44Z� 4- (reference Point elevation) #6) = 7/ IUE(-easurernents from -7 Concl usi n: ,r,? (actual) is greaterff/1e)s than 69(allOwed); therefore the house is/ is not over the height requiremielft-per E6 C 16.20-30 requirements L'TEMABUILDINGNISOHeight CalculationGrading Verification Worksheet.doc 8012 240TH ST S. W. 71 2* N88-0 _f2l t,-oi E '40N 10.01, —1 �E ;lUlElit JTEOY >10.01' WT. 54.81 -,�. I I - 20.OW- -96� PT A 132— 57B4 :oj 0 rn r 130 J* 8, 1 OA3� Sq F 00 Zn co 0 M va m 0 0 121.9 j 9 8 c OD Ix �i-- 1 --4 c P12T N88*06'21 *E m 0.56' N 06'2 =90, 916,1AB I Delta Delta.-O R=20.00 Z, R-=10.00 L=31-42 3,14]l S.F. L=31.42 V PRIME 0 -n 41 (t. ROAD 4 o N8715'1� E wi 60.00 In m _io u V) 07 50:ao, 0 or- "T. M 0 z HEIGHT CALCULATION 0 PT. A = 131.6 -4 0 PT. 9 = 127.4 m PT. C - 121.9 Pr. D - 129.8 510.7 / 4 = 12Z68 + 25' 152.68 B JLJ L 0 E P I Height Calculation Worksheet Date Permit Number c?w (0'. C) Address &Old [nspector__YjAj, Average Grade 1 016, 7 -75 z 0 Max Reight (25'-I-Ave.) 1 0 Actual Reight(A+13+C) Ri M C M 0 3 M: 0 "n =(C -7- M M 0 0 M C (n M z z z 0 Elevation of transit above Datum (B) M Datum Elevation (A) /0 L/temp/building/foans/height worksheet '77777"" city offowfi is low - Certftif ate qt oagpancy DEPARTMENT OF BUILDINGS PER INTERNATIONAL RESIDENTIAL CODE SECTION R1 10 AT: 8012 240" St SW Building Permit #: 2006-0924 occupancy established by this certificate: R3 Dwelling Units: No. Stories: 2 Basement: NIA Type of Construction: Owner of building: Falcon Ridne Homes, LLC. The Single Family Residence at 8012 240". St SW as been inspected and approved complying with the requirements of the 2003 edition of the International Residential Code as adopted by the City for the group and division of occupancy and the use for which the proposed occupancy is classified. Issued this 31" day of October, 2007 Chief Building Official By:_ Any change of occupancy or use requires a building permit and a new Certificate of occupancy Issued by the City of Edmonds Building Official. Permit Inspection Details Permit: BLD20060924 PERMIT 1001 - E-Eroslon Control/Mobilization complete? 1210412006 Hawkins 15 TESC per City's standards. Y Total Time: 15 1013 - E-Storm Tightline Comolete? 12/20/2006 Hawkins 15 ok to h/f the t/I y Total Time: is 1014 - E-Storm Connect to Stub complete? y 12=12006 Hawkins 15 ok to b1f the storm connection. y Total Time: 15 1017 - E-Footing Drain Connection Completa7 Z 12/2012006 Hawkins 15 fooling drain connection is okto b1f. y Total Time: 15 1034 - E-Water Service Line Complete? 10129/2007 Hawkins 0 Testect Okay to final. y Total Time: 0 �5 -4 Y'� X 1077 - E-Engineering Final 'Complete? m C 1012912007 Hawkins 0 Ok.ylofinal. y In Total Time: 0 --1 00 1106 - B;Setbacks comp ate Y C --I 3: m 11 1 /22/2006 Snook 25 SETBACKS APPROVED PER STRUNG PROPERTY LIMES y In Z Total Time: 25 1108 - S-Footings Comolelte?, C :1, Z 1112212006 Snook 25 APPROVED y Total Time: 25 CA 1110 -A-Foun dation Wall complete? 0 n 12106/2006 Snook 25 APPROVED Total Time: 25 m m 1116 - B-Slabinsulation Complete?. 0 12119/2006 Snook 20 APPROVED Y 0 C Total Time: 20 - In 0 1120 �e�Plumb Ground Work completO Y Z f- 04/11/2007 Snook 25 APPROVED Total Time: 25 11 �� "B-First Floor Framing Complete?. 0 . 5131/2OG7 Snook 30 APPROVED Y Z Total Time: 30 -4 3: 1126 - B.Plumb Rough In Complete'�' 04/11=67 Snook 25 y Z Total Time: 25 1128 - B-Gas TestlPipe complete! m 03/29/2007 Snook 25 APPROVED y Total Time: 25 1132-B-Exterlor Sheathing Complete? 03/26/2007 Snook 25 APPROVED y Total Time: 25 1136 - B-Shear Nailing Complete? Y,. 05/31/2007 Snook 30 APPROVED y 7/9/2009 9:29:37 AM Page I of 2 Total Time: 30 corilip ete 05/02/2007 Snook 6o CORRECTION NOTICE WRITTEN' N 05129/2007 Readwin 30 HEIGHT APPROVED PER SURVEY AND LETTER DATED MAY 17,2007 BY DAVID G y WEST PROFESSIONAL LAND SURVEYOR (ATTACHED) Total Time: so 1114V� B-Firalming 05 /31/2 007 Snook 30 APPROVED Y Total Timet 30 1144 ",BmWall Instilattion/Caulk 60M 14jej, P 05131/2007 Snook 30 APPROVED y Total Time: 30 114 -'&wFi6or1nSU1at10n1Cau1k z 05/31/2007 Snook 30 APPROVED y 0 Total Time: 30 0 B Ckilliniinsulation/Caum,� C 10125/2007 Readwin APPROVED y Total Time: 20 kN H 6et c a, !n5 0 letew�.,�, 3: v M C 06/1212007 Readwin 30 INSPECTED AND APPROVED y M 0 E, Total Time: 30 0 0 -t;B6iidihg-,F1nal,,' e C . ..... .. .. 10126aiW... 9saiwin 20 WROTE CORRECTION N 3: M M Z 1W29/2007 TEMP- 0 APPROVED, PENDING END APPROVAL. y 10-1 t'L NATOLA Total Time: 20 > Total Inspections: 25 Total Time: 565 Oil n M M 0 r C 091 M CD 111 0 Z z z 0 0 IT! 7/912009 9:29:37 AM Page 2 of 2