Loading...
20060925095556.pdfov ED City of Edmonds � o PLAN REVIEW COMMENTS BUILDING DIVISION Fst lggo (425)771-0220 DATE: September 25, 2006 TO: Beverly @ Land Visions bev@landvisions.biz FROM: Jenny Readwin, Plans Examiner RE: Plan Check # 2006-820 Project: Imran SFR Project Address: 23922 84' Ave W. During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Structural Consultants original comment #7 : EOR please specify the required support for the joists at the utility room and garage. Currently there is no support for these joists shown on the drawings. Add all post and beam information to the framing plan. 9/25/06 Provide beam calculation for new 51/8 x 16 % GLB. Also provide calculations to iustifv that larger footings are not reauired under multiple studs supvortinL- the beam. 2) Structural Consultants original comment # 10. The code requires a single 3x member to be used for shear forces that exceed 600 PLF. Notes in shear wall schedule states double the amount of bolts was used so single 2x may be used. It appears based off the analysis this will be exceeded and single 3x member must be used. Please modify accordingly. IBC 2305.10.10 exception. 9/25/06 no response riven. Please respond. 3) Structural Consultants original comment #11: Please modify detail 7 to state a minimum of 2 bolts shall be used. APA report TT -074. 9/25/06 Please respond no response given. 4) Structural Consultants original comment #12: Detail 8: EOR please specify the required spacing of the A35 clip in order to transfer the shear forces required per the analysis. 9/25/06 no response riven. Please respond.