Loading...
20060927 dean2-pool.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Comments Plan Check : Date: # bld20060927 September 22, 2006 th Project Name/Address: Dean; 8511 218 St SW Contact Person/Address/Fax: : Dan Dean Reviewer: Division: Jeanie McConnell, Engineering Technician Engineering The subject application has been reviewed but cannot be completed until the following items have been addressed/corrected. 1. Show the location of the pump house. 2. 8/21/06 - Show where the sewer line goes into the house and where the pump house connects to the sewer line. The connection point to the house side sewer must have a cleanout with a 12” locking lamphole cover. 9/22/06 – I understand there is not actually a pump house, but rather just a pool equipment pad. The pool is  not allowed to gravity drain with a direct connection to the side sewer. The pool water is to be pumped to a sanitary sewer cleanout provided on the exterior of the house, near the pool. This cleanout shall have a 12” locking cast iron lamphole cover. Show the location of the sanitary sewer cleanout (and lamphole cover requirement) and indicate how the pool  water will be drained, on the site plan. Will it be pumped by the pool equipment (from the drain at the bottom of the pool) and then flow from the pool equipment on the concrete pad to the sanitary sewer cleanout or will there be a separate pump operation that will suck the water from the pool and pump it to the cleanout (no drain at the bottom of the pool). Again, a direct connection from a drain at the bottom of the pool to the sanitary sewer is not permissible. 3. ok 4. 8/21/06 - If pool will have an auto fill device, a backflow device is required. Show the location of the backflow device. If it will be filled using a garden hose, an AVB device must be placed on the hose bibb. 9/22/06 – It is not clear to me from the information submitted how the pool will be filled. Please clarify how  backflow prevention will be achieved. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. JoAnne Zulauf is your Permit Coordinator for this project. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. _____9/22/06_____________ DATE MAILED PAGE __1__ OF _1__