Loading...
20060928082200.pdfTO: Tony Shapiro FAX: 425-778-3032 FROM: Ann Bullis, Assistant Building Official RE: Permit # 2006-0552 Project: Remax Office Building Project Address: 21920 76th Ave W During review of the plumbing and fire alarm permit applications it was found that a redesign to the approved Shell/Core plans has occurred at the 1St floor restrooms and storage area. Resubmit 2 sets of revised plan Sheets A2.1, A5.1, A6.1, and S2.1 showing the changes to Theresa Umbaugh, Permit Coordinator. These plans must be submitted and approved by the City before further separate permits will be issued. cc: Corstone Contractors, P.O. Box 2280, Snohomish, WA 98290 City of Edmonds of Epo PLAN REVIEW COMMENTS BUILDING DIVISION gst 1$90 (425) 771-0220 DATE: September 28, 2006 TO: Tony Shapiro FAX: 425-778-3032 FROM: Ann Bullis, Assistant Building Official RE: Permit # 2006-0552 Project: Remax Office Building Project Address: 21920 76th Ave W During review of the plumbing and fire alarm permit applications it was found that a redesign to the approved Shell/Core plans has occurred at the 1St floor restrooms and storage area. Resubmit 2 sets of revised plan Sheets A2.1, A5.1, A6.1, and S2.1 showing the changes to Theresa Umbaugh, Permit Coordinator. These plans must be submitted and approved by the City before further separate permits will be issued. cc: Corstone Contractors, P.O. Box 2280, Snohomish, WA 98290