o� EDS City of Edmonds o� d PLAN REVIEW COMMENTS BUILDING DIVISION gst $90 (425) 771-0220 DATE: September 28, 2006 TO: Phil King 1527 150th St. SW Lynnwood, WA 98037 FROM: Jenny Readwin, Plans Exami e RE: Plan Check # 05-177 2006-0544 Project: Ray Addition Project Address: 15625 75th Pi W During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. 1) ok 2) ok 3) Still need. Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. A separate form is required for each separate special inspector. • Field Welding • General Site Monitoring by Geotech of Record • Excavation/Grading/Site Preparation • Shoring(if needed) • Soil bearing verification • Subsurface drainage installation • Placement of fill and compaction • Temporary and final erosion control • Final letter 2) See additional comments attached. See attached structural comments from city consultant. Respond to each item in writing. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the above items to a Permit Coordinator. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 253 857 4151 Fax 253 857 5759 To: Marie Harrison City of Edmonds Edmonds, WA 98020 Re: Ray Addition 15625 75th Pl. NW Edmonds, WA 98020 Plan Review # 05-177 EECE # EDM 06-12 (2) Second Comment Letter The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. Original comment will be written if not addressed appropriately or unable to determine how the items were revised on the sets to meet the code requirements. SCOPE OF REVIEW The scope of this review is for the structural, requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. RF—COVED SEP 2 1 2006 BUILDING DEPT- Page 2 of 5 STRUCTURAL COMMENTS: General 1. Please justify that knee braces or other methods are not required to transfer the lateral loads far the new deck The lateral loads must have a direct load path shown on the drawings, including an analysis. Please submit this on the response. This still has not been addressed n the drawings or I was unable to determine how the drawings were modified. Revise drawing accordingly to transfer the required lateral forces. 2. 2. Based off the drawing the shear walls appear not to meet the 2 to 1 (or 3-112 to I with modified shear capacity) ratio as required per IBC Please clearly label the required shear wall lengths in order to meet this ratio. Also, submit an analysis for the shear walls in compliance with the maximum required height to width ratios per code. IBC 2305.3.3 This still has not been addressed. Please modify drawings and analysis accordingly. 3. 5. I was unable to find the required diaphragm nailing requirements on the drawings. Please either point this out or add to the drawings. IBC table 2306.3.land 2306.3.2 The new design has used the UBC but this is not the adopted code at this time. Please modify drawings and analysis to the state adopted code. 113C 1620 Also this information should be added to the drawings. Sheet A: 4. The code required the vertical bars into the footing to have a 90 degree hook. Please modify detail to clearly show the 90 degree hook. 5. Details should be clearly referenced to the drawings. Notes state where they occur. A non design professional should be making this decision. Reference all details clearly to the drawing where they occur. 6. Shearwall schedule should be added to the drawings. This sheet does not match the design professional shear wall schedule. 7. The code requires a single 3X member and not (2) 2x members. Modify drawings to state single 3X member. Sheet 4 LOWER FLOOR: Page 3 of 5 8. New drawing has new detail on this sheet that used the soil report to determine the requirements. Please submit soil report as noted in the new details. The detail state structural fill for 2000 psf per report. Please submit this on response. 9. Provide calculations for a 4" slab to support the bearing wall at the stairs. Per check analysis the 4" slab will not support the forces added. Please modify accordingly or submit analysis to justify the slab will be able to support the new load being added. Sheet 5 MAIN FLOOR FRAMING/LOWER FLOOR FOUNDATION: 10. 15. Please specify the required post to beam connection on the drawings. IBC 2304.9.7 The drawings still do show the required connection for the multiple studs post to the beams. Please add this information to the drawings. This is very important to have this connections added to the drawings. 11. Modify shear wall schedule for SW3 to state single 3x required and not (2) 2x. The code states a single 3x member shall be used. IBC table 2306.4.1 12.8. Please specify the required connection of the post to the foundation. IBC 2304.9.7 The drawings should also include the required connection for the multiple studs used as columns. This still has not been added to the drawings. 13. 10. Please sped the required size of the hanger to be used for the support of the floor system. All that is specified is `hanger typ'. IBC 2304.9.6 U210 hanger will not support the 11-7/8 TH 360 joist. A hanger is required to be specified on the drawings to support the TH joist. As noted on the drawing the beam is up and will require a face mount hanger to be used. This must include hangers that may support multiple joists. The only note I could find on the drawings was an IUl l but this one is not a hangers per the Simpson or USP catalog. Please specify the required hanger to use in order to check the forces will be able to be transferred. 14. 12. The drawings do not show any shear walls along the front of the structure. Based off sheet 8 there are openings at this location and there are not any walls that will meet the minimum height to width ratio. Please submit an analysis to justify. This still has not been addressed. Please clarify how the code required heath to width were maintained as required per code. Sheet 6 UPPER FLOOR FRAMING: 15. 13. Please specify the required connection of the glu-lam beam to the multiple studs. IBC 2304.9.7 The response state refers to detail. But the detail is for single post. The drawings state all interior post to be 4X6 and exterior post to be 6x6 post. Please note on the drawing that all opening required this post. The detail Page 4 of 5 implies only the exterior wall and glu-lam required post but this is not the case per the drawings notes. Please modify drawings in order to clarify the vertical support of this structure. 16. 14. Please speck the required number of studs under the beams. IBC 2304.9.6 Please note all opening required the post noted on the drawings. Also the base of the post connections shall be specified. It is not clear on the drawing how the required forces are being transferred to the foundations. 17.17. Please specify the required attachment and nailing for the drag strut on the drawings. Nothing is specified on the drawings at this time. Response states see engineer calculations but the drawing should have this information added. Please add this information to the drawings. 18. 18. Based off the drawings the shear walls appear not to meet the 2 to I (or 3-112 to 1 with modified shear capacity) ratio as required per IBC. Please clearly label the required shear wall lengths in order to meet this ratio. Also, submit an analysis for the shear walls in compliance with the maximum required height to width ratios per code. IBC 2305.3.3 This still has not been addressed 19. Please add the requirements for the new roof trusses in the upper left side. I did not notice this as new structure but it appear this will be new. There is no foundation for this or any other information's. This information should be added to the drawings. Sorry I missed this first time but since there was not any information below I thought this was existing but now it appear it is new. The drawings do not show anything but a note new roof truss. More information is required to be added to the drawing to show what will be built here. Please modify drawings accordingly in order to complete the review. Sheet 7 ROOF FRAMING: 20.19. Please clarify which sheet detail S is drawn on. This is shown to be required at shear wall 2. This has not addressed. There is no sheet S 1. Modify drawing to clearly show what is to be built. 21. 20. Please specify the requirements on the drawings for the drag strut that the truss manufacturer is required to design for. The response states refer to engineer calculations but the drawings are required to show this required information. Modify drawings to show the requirements to transfer the forces. 22.21. Based off the drawings the shear walls appear not to meet the 2 to 1 (or 3-1/2 to 1 with modified shear capacity) ratio as required per IBC 2305.3.3. Please clearly label the required shear wall lengths in order to meet this ratio. Also, submit an analysis to for the shear walls in compliance with the maximum required Page 5 of 5 height to width ratios per code. IBC 2305.3.3 This still has not been addressed on the response correctly. For example in order to use moment system the wall must be complete blocked. Please note this on the drawings. IBC 2305.3.3 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (253) 857-4151 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEM-ENT The project at 166Z6 –75-11 Pt t4) issued under building permit number requires special inspection and/or testing per rBC Chapter t7. The complete list of special inspections is attached to this document. BEFORE A PERMT CAN BE ISSUER: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review- Special inspectors shalt display identification when performing special inspections on site_ Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the follo-wing: A. Duties and Responsibilities of the Special Inspector Observe Work. The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC_ Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis—meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect - 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building .Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the folly ving: Description of -daily inspections and tests made with applicable, locations * Dist of all non-�conforrning items • Report on status of non -conforming items (resolved or unresolved) • Itemized changes authorized by the Architect, Engineer and City if not included in non- conformauce items. S. Furnish Final Construction report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and repotted. And, to the best of L-.kTEMPIBUILDING1SpecialfwpectionAgmementIRC.doc 7104 his/her knowledge the projt,:t is in conformance with the approved plates and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc_) shall be specifically itemized in this report D_ Contractor Responsibilities X. Notify the Special Inspector It is the duty of the contractor to nefify the special inspector when work is ready for special inspection. Note, the items fisted on the attached schedule and as noted on the approvers plans and specifecatious are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to'become familiar with the project. Z. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved pians at,the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector_ These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. M/Rer approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been subxuitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply wills the terms and conditions of this agreement Owner Special Inspector General Contractor City Building Official L_ITF-WXBUILDINGiSpecialI©spectionAgreemeirtiBC.doc 7104 Date Date Date Date SPECIAL INSPECTION ANI) TESTING SCHEDULE `� �'�] j j ! X BuuJMNGPawtr*o _ _fin _ - rstoaECTwooat� rEsrtHcnt�crtart nci�r.or seeca,tr.nur� REINFORCED CONCRETE, GUNFM GROUT AND MCIRTAR: STRUCTURAL ST EEIIWELDiNG. Cmenete Ganite Graaf Mortar —SMI =d Test (list spCcific --bas Wow) Aggrcgatc Tests Rdnfofcimg ruts Mx Designs Reinforcing Placement Bates Plant Inspavon IPspcu Placing Cast 5a,opies Pick-up 5amplcs Compression Tats _. _ Situp Material Jdeatiftcatioa — Wdd-glrtspcction E, -%Dp 0Field — Uhnsbnic Inspection O Shop © Field — ffigh --Stlr Boiling Iaspoctiou Qs w 'olReld ©A�zs ©N 'OX tit= O A49G — Metal Dock Welding Inspection — RciuforcingStect Welding Inspection l Mew Stud Welding Inspection PRECAST/PRESTRESSED CONCRE'T'E Concrete fuse" Weltiiog ]uspcction Pgcs past-7cps Pr"Tws Cladding AP 3uu FIREPROOFING- fitinfotring Teas _ Placenwtt Inspection Tendon TCM Densioarsts Mix Designs Y WdmessTests R4inforciag Plagancnt _ _ Inspect Batching Insert PlaCernrnt CuauctC Batching INSULATING CONCRETE.: Concrete P)accrncat — Sample and rest Grstaliauon ltucperiaa Placement 1."ioa Cast Satnplcs — Urat Weights Pick Samples Gompression Toss FILL MATERIAL: MASONRY — Acocptanco Tests PlacdrtCnt Inspection — Special Inspection Stresses used _ Fuld Dcosity- - P-IW4uy Aeceptancc Tuts (Masonry units- V call Prisms) Sabsegt mETr-sts (Mortar-Gtoot, lridd Will Prism) STRUCTURAL WOOD: Placement IMPoctioa of Units — Shear Wall Nailing Inspcuioa . — InspcctionofGlu4am Rib. — Iasp=wo of Truss Joist Fab_ _ ADDITIONAL INSTRUCTIONS OR OTHER TESTS — Sample and Tm Components AND INSPECTIONS: l0CDrnpzetedbr-,�% I Tck?bom No: Titic Wer CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at 9:� LO issued under building permit number requires special inspection and/or testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(&) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when .performing special inspections on site. Special 'inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities_ of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis—meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must -have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building. Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily. Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description of daily inspections and tests made with applicable locations • List of all non -conforming items • Report on status of non -conforming items (resolved or unresolved) • Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:ITEMPtBUMDINGISpecialInspectionAgreemientiBC_doc 7104. his/her knowledge the protect is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (Le, missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready .for special inspection. Note, the items listed on the attached schedule and as noted on the approved planes and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at.the j obsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of.Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the fatal report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS .1 have read and agree to comply with the terms and conditions of this agreement. Owner Special Inspector General Contractor City Building Official 1-_1TEMP1BUILDINGlSpeciallnspectionAgreementlBC_doc 7104 Date Bate Date Date SPECIAL INSPECTION AND TESnNG SCMEDULE •—•---•. - ` ✓ice �O�`� �� `� a�mnwwcrtzxttHrrt�a 1 MOM rAuun ss ... {SCJ �sstr�,nas c cr_a« •.� cr REMORCED CONCRETE, GUNTTI;, GROUT AND MORTAR: STRUCTURAL STEELJWELDING: Ceacme Ganite Grout Mortar k Aggregate Tcsts Itckdaming.Tcsts Muu Designs Rii umiqg Plaopttcnt B�tcirPlaatitsspc�on Inspect Placing Cas, Sanupks Pict -up Samples Cowpression Tcsts — 5a�p aad Tat tInst SPCCI c snenwas worw) . T Siwe Material Identiftcatiott - Wcidwg - osbop O V-rcld — Uk'ornic Inspection OShoP OField — High swm9th Bulling © Shop O Frdd O A325 [IN O X O F O A490 — Metal Deck Welding inspection — Reiuforring ned Wckfiiog isspm-ckm �. — MCLA Stud wading lttspcctioa PRECAsTrnRESTRESSED CONCREM corrcnete Insert Wilding Inspection Pam Post -rens Prc-Tats Cladding Aggrcgate'fests FIREPROMNG: R_foxdn Tens — Placcrnent Iaspoction Tendon Tests — Dcnsity Tcsu Mix Designs _ Thickness Tests Reinforcing Plac4mcnt — Insp03 Batching Iesrst Placeracttt CarterertBatching INSULATING CONCRETE: Coocxcte Placement w Sampic ami Test installation Inscpction Placcvretnt Inspection Can Samples Unit Weights Pick- Sampics CompressiohTcsas FILL MATERIAL: MASONRY- — Acceptance Tests Placement Inspection Special Inspceiion Suesses Used Field Density. Ptclimiaary Acceptance TcslstMasourp Unica_ Wali PrismSD — Smbsegk=tTesu fMonmt Grov4 Heid Wail P&=) STRUCTURAL WOOD: — Placemen, Inspection of Unica — Shm Wall Nailing Impectiou ' — lacpcation of Glv-lam Fib — lnspcctionof Friss lois, Fab. ADDITIONAL INSTRUCTIONS OR OTHER TESTS — Swnpk and Test cAnymcnts ANDINSPECTIONS: