20061002112418.pdfo� Eng City of Edmonds °ted g PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 2, 2006 TO: Eric Sunquist Fax 425-774-6315 FROM: fenny Readwin, Plans Exam<* RE: Plan Check # 2006-0997 Project: SFR Project Address: 9011 240'h ST SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Site plan shows two datum points (a nail in fence post at +100 and a catch basin at 452.66) please modify and revise height calculations accordingly. 2) Show North fireplace bumpout on the site plan. 3) Specify ledger attachment for covered porch roof with balcony above. Minimum is 318" x 4 %2" bolts/screws at 3" o.c. Specify minimum or provide calculations from Engineer of Record for alternate attachment size and/or spacing. 4) Specify on the elevation views the grade slope away from the building. If minimum 6" within 10' is not possible or habitable or useable space is below grade, foundation drainage is required. Provide footing drain detail on foundation sections complying with R405.1 and show required drain locations on the foundation plan. 5) Specify height of guardrail at top of stairs open to below. Also, guardrails are required to resist 200 psf and the in -fill components must resist 50 psf per Table R301.5. Note on plans. 6) IRC requires vertical rebar to have a standard hook. Revise foundation details to show standard hook. 7) Sheet S-1 is not signed by the Structural Engineer. Have Engineer sign our plans or provide new . stamped and signed sheet S-1