Loading...
20061016114636.pdfEpos City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION Fsr 1 Sgo (425) 771-0220 DATE: October 16, 2006 TO: Pacific Emerald Homes lhelleren(Qverizon.net FROM: Jenny Readwin, Plans Exam' er RE: Plan Check # 2006-0992 Project: Thatcher SFR Project Address: 8505 200' St SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Structural Consultants Comment #6 Shearwall schedule: SW4 please note that the framing member shall be 3x member and the nails shall be staggered. IBC 2306.4.1 footnote e. Shearwall schedule notes 3 and 7 were froth changed to 3x sill plates. Note 7 should he 3x studs as noted on original plans submitted. Please revise. 2) Structural Consultants Comment #14. Per definition the diaphragm maximum length to width appear to exceed the code maximum diaphragm dimensions rations. Please modify accordingly. Table 2305.2.3. response says see letter from Reed and Associates. I was unable to located this response. Please provide. 3) Structural Consultants Comment #21. Detail 2: plcase clarify this section cut that states 16/A9. This appears not to be the correct reference. Please modify accordingly. Response says detail referenced on sheet A-8. The confusion is that in detail 2/A-9 detail 16/A9 is called out and this detail is roof/floor shear and does not make sense specified in detail 2/A-9 (raised stem .wall). Please clarify.