20061017142410.pdfEagle Eye Consulting Engineers, P.S.
PO Box 523
Olalla, WA 98359
hoytjeter@centurytel.net
360 874 0562
Fax 360 874 0591
To: Fireshield
PO Box 2389
Gig Harbor, WA 98335
Attn: Robert Moren
Re: Korean United Presbyterian Church
8506 238"` Street SW
Edmonds, WA 98020
Plan Review # #2006-1110
EECE # EDM 06-56
The above referenced project is in the process of plan review for compliance with
Edmonds ordinances and applicable codes (Fire Suppression only). The following
comments, deficiencies/corrections must be addressed prior to completion of plans review
and subsequent issuance of permits.
Provide revised plans and calculations along with a written response to each of the items
listed below to facilitate a shorter back -check time.
SCOPE OF REVIEW
The scope of this review is for Fire Suppression requirements of this project.
All features were checked only to the extent allowed by the submittals provided. All
portions of this project are assumed to meet or will meet other departmental requirements,
conditions and concerns before permit approval.
AUTOMATIC FIRE SPRINKLER COMMENTS
Sheet 2 BASEMENTS:
1. Between grids 6 and grid 7 and along grid C: The two sprinklers heads (one is
hydraulic node 49) are too far (between 8 and 8-1/2 feet) from the wall and the
small room rule may not be used in this are. Provide sprinkler heads within 7 1/2
feet of the wall. NFPA 13, 8.1
2. Provide a sprinklers head at the bottom of the elevator shaft.. (If this is not the
hydraulic lift elevator, then this will not be required. NFPA 13, 8.14.5.1
Korean United Presbyterian Church
Plan Review Number: 2006-1110
8506 238' ST. SW
EECE # EDM06-56
3. In the men's and women's restroom (Along gridline C), there are parts of the room
which are not covered due to wall obstruction vs. head placement. (2area, total).
Please adjust or add heads to provide full coverage. NFPA.13, 8.1
Additional corrections may be required following receipt of corrections and additional
information as requested.
Your plans are being reviewed concurrently with the Building Department, Fire
Department, Zoning Department and Public Works Engineering. Changes, clarifications
or additional corrections may be required subsequent to the Building Department plan
review when comments are received from the other concerned departments.
Should you have any inquiries regarding this letter, please contact Hoyt Teter at (360) 874-
0562 between 8:00 a.m. and 5:00 p.m.
Hoyt Jeter, P.E.
President