Loading...
20061018144208.pdfor EDS City of Edmonds 0 PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 18, 2006 TO: Kelly Crawford Gasline Mechanical Sent via e-mail to kelly gasline(a7hotmail.com FROM: Ann Bullis, Assistant Building Official RE: Plan Check # 2006-0850 Project: Partial Mechanical for Point Edwards Building 8 Project Address: 55 Pine Street During re -review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please submit written responses to the comments below, including where changes can be found on the plans, and 2 sets of revised plans/documents (affected sheets only) to Marie Harrison, Permit Coordinator. 1. Sheet M4.0 shows no deck above GEF -1, while Sheet M2.1 does show a deck above GEF -1. Please coordinate. If the outlet will not be completely under the deck, then it must meet the 10 foot minimum distance to building openings in the dwellings above (currently scales to less than 10 feet) please dimension. 2. GEF -2 will be within 10 feet of building opening for the dwelling unit above. There is no deck overhang shown in this area (Sheet M2.1); however the elevation view (Sheet M4.0) shows it under a deck. Please coordinate. If the outlet will not be completely under the deck, then it must meet the 10 foot minimum distance and be dimensioned. 3. GEF -3 is also not under a deck and scales to less than 10 feet to building opening(s) in the dwelling unit above. Dimension the minimum 10 foot distance on the plans or place completely under the deck.