20061018145803.pdfof EDS City of Edmonds 0 y - PLAN REVIEW COMMENTS BUILDING DIVISION 1890 (425) 771-0220 DATE: October 18, 2006 TO: Phil King jjgurnee@comeast.net FROM: Jenny Readwin, Plans Exami er RE: Plan Check # 06-050 (Permit Trax 2006-0575) Project: Gurnee SFR Project Address: 18210 Homeview Dr. During re -review of the above noted application, it was found that the following information., corrections, or clarifications are needed. 1) FOURTH COMMENTS 10/18/06 Rockeries were changed to retaining walls max 4' high, Calculation and detail provided still need to be stamped and signed by Engineer of Record. 7' retaining wall still needs stamped and signed calculations and detail before we can send out for peer review. Please provide. THIRD COMMENTS Per our Rockery/Retaining"_ Wall handouts, comments from Ed Sibrel, En,-ineerinz and my correction we still need desizn calculations for the rockery reeardless of heieht and we need calculations Lor proposed retaining wall. Retaining wall will need to be sent to peer review at owners cost so we will not send it out until we eet the calculations. Please Provide. SECOND COMMENTS Still need top and bottom wall elevations at 5' intervals. Walls cross several topo lines so one top and bottom wall elevation will not be sufficient to cover the entire wall. Also still need structural calculations and details stamped and signed for proposed rockery and retaining walls. FIRST COMMENTS Provide top and bottom wall elevations for all proposed retaining walls and/or rockeries at 5' intervals. Rockeries and retaining walls of any height located in a critical area must be designed by a Washington State Licensed Professional Engineer (see enclosed rockery and retaining wall handouts). Provide stamped and signed details and calculations for proposed rockery and retaining walls. 2) ok 3) ok 4) ok 5) ok 6) ok 7) ok 8) ok 9) ok 10) ok 11) ok 12) SEE ATTACHED e SET OF COMMENTS FROM STRUCTURAL CONSULTANT See third set of comments from structural consultant. See additional comments attached. See attached structural comments from city consultant. Respond to each item in writing. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the above items to a Permit Coordinator. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytleter@centurytel.net 360 874 0562 Fax 360 874 0591 To: JoAnne Zulauf City of Edmonds Edmonds, 98020 Re: Gurnee Residence 18210 Homeview Dr Edmonds, 98020 Wednesday, October 18, 2006 Plan Review #2006-0575 EECE # EDM 06-10 (4) Fourth Comment letter Structure Aren S,F, Lower Floor 1134 Main Floor 1763 Upper Floor 334 Total 3.231 Garage 814 otaI 4045 Main Floor Deck 321 Roof Deck 135 Grand total 4501. The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the structural requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Original comments will be written in italics if not addressed appropriately to confirm code compliant. Second comments that were not addressed will be written in red. All items are Page 2 of 7 EDM 06-10 (4) 2006-0575 required to be clearly addressed and show where on the drawing these items have been modified to meet the minimum code requirements. The drawings have many discrepancy for both lateral and gravity requirements. Also the engineers state on the drawings that he is only stamping for lateral loads only. Submit stamped drawing for the gravity support of the members. IRC is for conventional framed house and this house does not fall under conventional framing. A licensed design professional shall stamp the drawings not only for lateral loads but also the gravity requirements. Resubmit drawings modify accordingly. STRUCTURAL COMMENTS General 1. Retaining walls over 4 feet are required to be designed by a licensed professional. Submit analysis for the retaining walls. Analysis still has not been submitted for the retaining wall. Submit analysis to justify. Analyses submitted clearly show for the 4 foot wall the code required safety factor is exceeded. All information on the drawings that is called out must meet the minimum code requirement. Resubmit analysis to justify the retaining walls that are called out on the drawings to be built. .2. 3. 1. Based off the site plan it appears there is going to be a concrete retaining wall approximately 10 feet high. Please add the requirements for this condition to the drawings. IBC 1806 This needs to be verified by the City of Edmonds. The response state maximum height is 4 feet. But it appears this will be exceeded. This has to be verified by the city. Submit design analysis for the retaining wall shown. None was submitted in the response or previous submittal. This is important to assure all code required forces are resisted. IBC 1806. The design analysis submitted clearly show the retaining wall will not meet the code required forces. The sliding force shall not exceed 1.5 but the analysis clearly shows this exceeding. Enercal program does not even match the wall specified on sheet B. All the retaining wall that are specified on the drawings shall have analysis submitted to justify the wall will support the required forces. If the certain wall height is not going to be used then this should be crossed off the set. But the walls that are going to be built must meet the minimum code requirements and analysis is required to justify the will resist the required design loads. 3. 5. 4. The drawings appear to being using a moment frame at the garage entrance. The R value for ordinary moment frames is 3.5 not 6.5. Please resubmit lateral analysis to account for different seismic resisting elements. IBC table 1617.6.2 IBC 1617.6.2.3 It is not correct to just increase the frame by the ratio. Also, the diaphragm must be checked. The code has different R values based off the different stiffnesses of the vertical resisting elements. The analysis is using a Page 3 of 7 EDM 06-10 (4) 2006-0575 flexible diaphragm so the smallest R must be used for the diaphragm analysis. Resubmit analysis with an R of 3.5. Now the new drawings state shear wall to use where the frame was required. This does not meet the code requirements. Shearwall 3 will not transfer the required forces. Please add to the drawings the requirements for the required forces to be resisted. It is not clear what is going too built. Please modify drawings clearly in order to complete the review. There are many discrepancies shown throughout the set. For example the drawings state 4x6x1/4 frame with shear walls. Based off the drawings there is no way to determine what is going to be built. Submit analysis to justify how the walls will meet the height to width requirements as required per code. Now the drawings are stating to use again the moment frame. The horizontal diaphragm is required to be design for the smallest seismic R value. Resubmit design analysis to address the diaphragm requirements with an R of 3.5 not just the frame.. Sheet 5 of 9 Foundations 4. 6. 5. Please provide analysis and detailfor the 9' high foundation wall. Detail should be added for the requirement far this wall. The detail on sheet 9 will not work for the required design forces. Please submit this on the response how detail 9 will work for this wall or modify accordingly. IBC 1604.4 This has not been addressed on the response. There are no details for how this is to be constructed on the drawings. Also, the new analysis appears to assume a restrained top and the connections are very important to be detailed to be able to transfer the required forces. This should be added to the construction drawings, including an analysis. This still has not been addressed approprietly. 5. 8. 7. The shear walls do not meet the minimum 3-112 to 1(wind) and 2 to 1 (seismic). If footnote a is used then the seismic shear wall requirements may increase to 3-112 to 1. Please modify and submit analysis accordingly. IBC table .2305.3.3. This has not been addressed in the response. Resubmit an analysis to account for the proper height to width requirements. Sheet 6 of 9 Main Floor Framing 6. 9. 8. There is a post -it note on the drawings to add the moment frame detail but this has not been added to the sheet. Please add this to the set as required to show compliance with code. This still has not been addressed. The drawings are confusing what is going to be built for the frame. One place it state 4x6x1/4 and then also state 6x6 posts. The drawings should be clear on what is going to be built. It should not be left up to the contractor. 7. Submit analysis for the moment frame in compliance with IBC 2205.2.2 Moment frames are required to be analysis and detailed per the requirements of IBC Page 4 of 7 EDM 06-10 (4) 2006-0575 2205.2.2. The drawings keep going back to a shear wall then to a moment frame. Please submit design in compliance with the IBC 2205.2.2 8. 10. 9. 8. Please justify knee braces, X -Bracing, etc is not required at the deck framing. How are the lateral loads being transfer far the deck? CC66 bracket is not approved to transfer lateral loads per Simpson catalog. IBC 2304.9.6. This still has not been addressed. The drawings still have not clearly addressed the lateral load transfer for the deck. 9. 11. 10. 9. Please provide detail at the deck where the Shearwall bears on the PT 2x10. Details on the drawings have not dealt with this. The detail shows this to be continuous at the Shearwall. Please provide detail for this condition on the drawings in order to complete the review. IBC 2304.9.6 A detail is required for the shear wall where the PT 2x10 are called out The 2x105 have to bear on the shear mark SW2 and there must be a load transfer at this location in order to transfer the forces. I wrote this comment for this sheet so if you look at where the deck is at you would see the shear walls called out. If there were grids on the sheet it would be easier to point out the location. There is not a clear load path to transfer the shear forces at these locations. If you look at this sheet you state PT 2x10 @16" O/C but there is not any detail to deal with how the loads are going to be transferred at this location. This is required to be shown on the drawings. Submit analysis for the required support of the deck framing. This still has not been clearly addressed on the submitted documents. 10. 12. 11. 10. Please provide detail for the connection BMA to BM C. IBC 23 04.9.6 Response states `see detail' that is added to the drawings. The detail states HIT hanger. This hanger is not approved to be used with a glu-lam beam per the Simpson catalog. Please specify a hanger that may be used to support the glu-lam beam and be used with a wide flange beam. This still has not been addressed. Please specify the size of the weld to use for the connections. Also special inspection is required for field welding and should be noted on the drawings. 11. 13. 11, 11. Please provide a detail for the connection ofBMB to BM C. IBC 23049.6 The response states `see detail' that is added to the drawings. The detail state HIT hanger. This hanger is not approved to be used with a glu-lam beam per the Simpson catalog. Please specify a hanger that may be used to support the glu- lam beam and be used with a wide flange beam. All that was done is erased the hanger. More information is required to be added to the drawings to complete the load path. Please specify the size of the weld to use for the connections. Also special inspection is required for field welding and should be noted on the drawings 12. 15. 13. 13. Please add to the drawing the requirement for the joist drag strut. The joist manufacture typical only design for the dead plus live load and leave the Page 5 of 7 EDM 06-10 (4) 2006-0575 lateral up to the design professional. Please either add to the drawing the requirement far the drag struts or design a member including the connection at this location. IBC 2304.9.5 This has not been addressed at this time. The joist manufacturer does not do a lateral analysis for the structure. This is required to be clearly labeled on the drawings. Please add this information to the drawings. I was unable to determine how this was addressed. OK 13. 16. 14. 14. Please clarify where the detail is for the note stating "4x6x1 /4 steel tube frame per detail". Where is the detail? How are the members being connected? Please add this information to the drawings. The response states `see detail' but there is not a detail on the drawings for this. There is a post -it note to add the detail but it was not added to this sheet. Please add this detail to the drawings. This still has not been addressed. Submit analysis for the base plate of 1/4 and (2) 518" bolt to transfer the required forces. The base plate appears not to be able to transfer the forces. Submit analysis to justify. 14. 17.16. 16. It is not clear what is required for the header beam size. Please add this information to the drawings. IBC 106.3.3. This still has not been addressed on the drawings. Please add this information to the drawings. This still has not been addressed. All headers shall be clearly label on the drawings. For example the header at the great room. EOR of please provide detail at the intersection of 4x6 header and 4x12 header. Based off the drawing there does not appear to be enough room at the intersection for multiple studs to support this member. A detail is required to be added here to verify what will be built in the field. Alternative add one continues 4x12. 15. 18. 17. 17. Provide analysis for the beam supporting the girder truss above. IBC 1604.4 This has not been addressed. Please submit this on response. This still was not addressed. Responses state uses a GLB 6-3/4X24 but the drawings do not reflect this. Modify drawings to show this beam. 16. 19.18. 18. Provide analysis for the beam that is supporting the (3) 1-314X 11-7/8 micro lam. IBC 2304.9.7. This has not been addressed. Please submit this on response. This still was not. addressed. 17. Provide detail for the connection of the 3-11$X9 GLB and the 4X12 header specified at the stairs. How are these beams being supported. 18. 21. 20. 20. Please provide analysis for the horizontal diaphragm.. IBC 1620.2.5 The analysis submitted is per UBC and not IBC on page 11. Submit an analysis per the adopted code at this time. Submit analysis for the requirements of the horizontal diaphragm. This still has not been done per the international codes. The horizontal diaphragm analysis submitted exceeds the minimum code requirements. For example page 13 state 318" Plywood stated this can resist 380 PLF. This is not Page 6 of 7 EDM 06-10 (4) 2006-0575 correct. Modify analysis per the current allowable shears as specified in table 2306.3.1 Sheet 7 of 9 Upper Floor Framing 19. 22. 21. 22. Please specify the required connection of the typical 6x12 DF#2 beam to the post. It is not clear what the required connection will be used for in this project. IBC 2304.9.6. This still has not been addressed. This still has not been done. This still has not been clearly added to the drawings. Sheet 8 of 9 Roof Framing 20. 23. 23. 26. Please add the required connection of the 3-1/8X12 ridge beam to the supporting post. It is not clear the size of the post required or the required connection. IBC 23049.7 The revised drawings have this called out on one side but not the other side. It is important to clearly specify the required support of the member to assure the required forces may be transferred. Please clean up the details on these sheets. One place there is one type of strap specified than another on the plan. Also straps are only approved for tension and forces not out ofplane forces. A connection is required at the base to resist lateral translations. Modify drawings in order to meet the code requirements. EOR the allowable bending stressed use for the two span glu-lam beam was 2200 psi. Since this is a two span conditions and the glu-lam beam is 22FV4 the maximum bending stress 1850 and not 2200 psi. Maximum bending moment will be at the support and not at mid span. Note glu-lam beams are fabricated with 2x lams and it depends which combination symbol determine how the beam will be built. See NDS table 5A to assist in which allowable stresses to use for the design of the members.. 21. 24. 24. 27. Shearwall at the door opening does not meet the minimum 2 to 1 ratio. This may be increased to 3-1/2 to 1 iffootnote A is met. Provide analysis to justify. IBC table 2305.3.3. The response states p10 of the calculation. This is for the garage panel not for the shear wall for the media room. This is required to be submitted to show code compliance. This still has not been addressed appropriately. Modify drawings to show complete load path clearly. This still has not been addressed appropriately. For example the drawings show the wall 9 feet but the analysis state 8 feet. Sheet 9 of 9 Building Sections 22.25. 25. 28. Please provide detail on the drawing for the connection of the guard rail to resist the required 200 pound force applied in any direction. IBC 1607.7.1 The response states `see detail on this sheet'. Submit an analysis to justify this will resist the required force of 200 pounds. Per a check of analysis this will not resist the code required force. Submit engineering analysis to justify detail. This still has Page 7 of 7 EDM 06-10 (4) 2006-0575 not been addressed. Not the drawings state the post 8 foot on center. The infills shall be design for 50 psf including the resist elements. This will control the design when spacing the post at 8 foot O/C. Please see either IBC 1607.7 or IRC table R301.5 23. 26 26 29. Please specify the spacing of the 4X4 post. It is not clear on the drawing what the spacing will be. Please add this to the drawing. IBC 106.3.3 Response states `see detail on this sheet'. The code states for single family homes, hand rails and guards shall be able to resist single concentrated loads of 200 pound applied in any direction. Per a check of analysis this will not resist the code required force. Submit engineering analysis to justify detail as shown on the drawings. Drawing now state post to be spaced at 8 foot on center. Also the details in the engineer analysis do not even match the drawings. The contractor will be building the drawings based off what is specified on the drawings. The top and bottom rail will not resist the required force if this is the case. Submit analysis for the guard rail requirements to justify the forces may be resisted. Drawings have not been modified to 6' OIC as stated. Also analysis per IRC table R301 must be performed to verify complete load path. 24.27.27. Habitable rooms shall have a height of not less than 7 feet, but the drawings state 4 feet for the media room and deck. This does not meet the code required heights. Exception 3 state the following note more than 50 percent of the required floor area of a room or space is permitted to have a slop ceiling less than 7 feet in height with no portion of the required floor area less than 5 feet in height. Drawing state 4 feet. R305.1... This still has not been addressed appropriately. The state building code does not allow 5 foot high habitable rooms. This still has not been addressed appropriately. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (253) 857-4151 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President