Loading...
20061019102722.pdfOr Eby City of Edmonds _ ,°fid PLAN REVIEW COMMENTS - BUILDING DIVISION 8St g90 (425) 771-0220 DATE: October 19, 2006 TO: Scott Scrieber ronscottconstinc@aol.com FROM: Jenny Readwin, Plans Exam ner RE: Plan Check # 2006-0970 Project: Ronquillo SFR Project Address: 812 Bell St. During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) ok 2) ok. 3) Structural Consultants Comment #3. Structural Calculations are still required to justify post sitting on edge of footing. #3 FOR submit analysis for the spread footing supporting the post. The post is a 4x4 and is sitting only on a 4" stem from the spread footing. The drawing state 4X8 HF #2 beams typical at the perimeter. The posts are 4x4 and 4x6 at splice as noted on the drawings. Please increase the footing size at the perimeter or submit analysis to justify. 4) Structural Consultants Comment #7. Please specify required hangers on the plan. Y was unable to locate where these were called out. EOR please provide detail for the required connection for the Glu -lam beam that is required to be supported by the girder truss. Typical Glu -lam hanger required the back of the hanger to be supported to prevent rotation of the hanger. Without having a detail here there is no way to determine what will be the connections. This should be added to the drawings to show this. IBC 2304.9.6