Loading...
20061020104245.pdfo� rpo City of Edmonds d PLAN REVIEW COMMENTS BUILDING DIVISION F!r ggo (425)771-0220 DATE: October 20, 2006 TO: JD Newton Construction Inc. jd@jdnewtonconstraction.com FROM: Jenny Readwin, Plans Exa mer RE: Plan Check # 2006-.1052 Project: Edmondson Addition Project Address: 17901 69�h Ave W. During.re-review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) On the revise plans submitted the beam in the laundry room was changed to say GLB. Please specify which size of GLB and provide calculations. 2) Note on foundation plan at the covered porch now says LUS-46 per SDA. Hanging beams off posts does not meet conventional construction. Provide calculations from EOR. 3) Detail 9/S 1.0 was redlined to 6" footing width. Engineered Stamped plans can not be changed without a letter from the EOR. Please provide letter from EOR or removed redlines.