20061025143120.pdfO, EDS City of Edmonds 0 PLAN REVIEW COMMENTS BUILDING DIVISION Esq. 1 ggo (425) 771-0220 DATE: October 25, 2006 TO: Dwight R McGrew michelbz@nwlink.com FROM: Jenny Readwin, Plans Exa RE: Plan Check # 06-173 through 06-191 Project: Michele Construction 9 -Single Family Residences Project Address: 8022-8038 212th St SW During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) for each plan review number, with a written response to each of the above items to Theresa Umbaugh, Permit Coordinator. When resubmitting site plans provide Two (2) large and one (1) reduced for each plan review. Site Plan Corrections for all 9 Plan Reviews 1) ok 2) ok 3) ok 4) ok 5) ok 6) ok 7} Response says it was changed but no landscape elan was submitted on this last resubmittal. Please provide. It is still unclear on the landscape plan where the proposed fences will be located. Please clarify. Landscape plan shows proposed fence in the legend and it is unclear exactly where it is located on the plan. Clarify and also show location of proposed fences on the site plan. Also, clearly note existing fences to remain. 8) ok 9) A 6 Alex under the old codes would be an R-2. Please revise and also show location of imaminary property line. Still need. Response says see PX but I could not locate this information on this sheet. For the existing 6-plex specify type of construction and occupancies and show imaginary lot line between 6--plex and new residences to show that the proposed single family building location on the lot will not affect the 6 -plea for exterior wall and opening protection including projections IBC 704.3, 704.5 and 704.8. If the existing 6-plex will need to be altered to comply with the exterior wall and opening protection, provide a permit application and plans for proposed changes. 10) ok 11) ok 12) ok 13) ok 14) ok 15) ok 16) ok 17) ok 18) ok 19) ok 20) Still need before I can sign off New based on submitted Geotech Report: Provide letter from Geotechnical Engineer of Record stating that they have reviewed the plans and that they are consistent with the report recomiriendations. 21) Still need before permit_ can be issued. New based on submitted Geotech Report: Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. • Soil Cuts • Foundation sub -grade verification • Retaining wall/rockery placement • Placement of fill • Subsurface drainage installation • Temporary and Final Erosion Control Page 2 of 2