Loading...
20061055.pdfr City of Edmonds Permit Application Form Permit Application for: E] New Single Family E] New Com/Apt R Addition El interior Remodel r-1 Garage/Carport El Repair Ej TI/Change of Use El Fence E] Gradin cvds Storage/Shed —x El Sign E] Fire System (Specify) E]Rockery/Retaining Wall Fj Other (Specify) z 9 Brief Description: lv­�tt 0 m k­tcl 0 Ck Site Address: A7 Ve -7 VJ 01 g-0 7- Suite # Sno County Tax Account Parcel #: 3&2-71 0 � c4 0 (+ 00 0 C m MO 0 Businessrrenant Name (if applicable): Mxdvn,— v 0 C X m PROPERTY OWNER: FAMOKetz, m z 10 1 Mailing Address: 70,42-o 6,5`h Ave, JAJ C - > z r- -i 65 City: L�WUWV,2d —State:—VV A Zip: 1 RV 0 -n 'n Phone: FAX: tl E-Mail: '��V(AMkMWO-a-& m m 0 FA 0,­ 0 M C CD CONTRACTOR: OSame as Property Owner 00ther (Name) 9 ca M 0 Z Mailing Address: X City: --State: 7ip: Phone: E-Mail: FAX: z State License Number: Exp: Date: City Business License No:_ C0 z APPLICANTICONTACT: 0 m .EM OSame as Contractor 00ther (Name) Y-- Fill out the following information if "Other'. Mailing Address: City:_ State: 7ip: Phone: FAX: E-Mail: L:kTEMP\BUILDING�WEBchec4disIsNSFR.COMM.APP�docSI3112006 EDMONDS ONE EDMONDS SCHOOL DISTRICT CAPITAL PROJECTS 20420 - 68th Avenue West OFFICE Lynnw ad, Washington 98036-7400 SCH(3DL 425-431-71066 FAX 425431-7171 DISTRICT Includes Brier, Edmonds, Lynawood, Mountlake Terrace, and Woodway October 18, 2006 Gina Coccia Planner CityofEdmonds; Development Services Department Planning Division Re: Madrona K-8 Science Lab Safety Upgrades Group 2 Bld 2006-1055 Attachments: "N'- Proposed Mechanical Unit, I page "B" - Site photos w/ reference site plan, 5 pages Dear Gina, This letter is regarding plan review comments for the above referenced project. As stated on the approved permit set of plans "Pursuant to ECDC 20.10.070.A.3, mechanical equipment shall be screened from view (or paint to match bidg color)." I am requesting that this requirement be waived, or possibly addressed after the rooftop mechanical unit is installed, due to the limited visibility from the surrounding properties. As shown on the attached photos taken from 236th St. S.W. looking in at the school J building, the natural tree buffer as well as the site topography greatly reduces visibility of rooftop units. The proposed mechanical unit location will not impede views or attract attention to the school. I appreciate your consideration of this request and look forward in working together to resolve this issue, Sincerely, CITY COPY Matt Finch Reque Construction Project Coordinator 20 e"rTmew . bs Cc. Stephen Bullock, Senior Planner Theresa Umbaugh,Permit Coordinator .OUR MISSION. To ADVOCATE for all students by PROVIDING a learning environment which EMPOWERS students, staff and the community to MAXIMME their personal, creative and academic potential in order to BECOME lifelong learners and responsible world chimes. z 0 0 C in M X in in Z C 2 O"n .M -49 3: in m 0 C in V) k 0) in 0 z z 9 0 in