DATE: August 18, 2006
TO: Regal Homes
Fax (425)290-9941
FROM: Jenny Readwin, Plans Exami
RE: Plan Check # 05-355
Project: Regal Homes SFR
Project Address: 22808 961' PI W.
During re -review of the above noted application, it was found that the following information,
corrections, or clarifications are needed.
I) ok
2) ok
3) ole
4) Still Need from Geotechnical Engineer of Record Special inspections are required for the
following. Complete the enclosed special inspeotion agreement signed by the owner, the general
contractor and the special inspector and submit to the City for approval prior to issuance.
• Soil bearing verification
• Proof rolling
• placement of fill and compaction
• General site monitoring by Geotechnical Engineer of Record
• Final report from Geoteohnical Engineer of Record
• Soil Nail.
5) Items ##S, 6 and 10 response said "No Changes': Please provide more derailed response in
order to address these items. See attached structural comments from city consultant. Respond to
each item in writing.
6) New, Per letter from Dennis M. Bruce, P.E. Dated May 5, 2005 soil nailing will take place.
Show location of soil nailing on the site plan as well as mentioned proposed easement
referenced in letter_ Soil nail design will be sent out for peer review at applicants expense.
7) New: Provide 3 copies of all referenced reports, plans and photos noted in geotechnical review
letter from Dennis M. Bruce, P.E. dated May 5, 2005.
8) New: Owner to provide City with letter specifying who will act as Geotechnical Engineer of
Record (Dennis M. Bruce, P.E., Earth Consultants or Golder Associates). The Geotechnical
Engineer of Record needs to submit a letter stating that they have reviewed all the submitted
Geotech reports and all construction plans and they agree with the recommendations or to
specify any further recommendations or clarifications they may have.
Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a
written response to each of the above items to a Permit Coordinator.
o� EDO City of Edmonds
—
`' PLAN REVIEW COMMENTS
BUILDING DIVISION
�Sr I $go (425) 771-0220
DATE: August 18, 2006
TO: Regal Homes
Fax (425)290-9941
FROM: Jenny Readwin, Plans Exanu
RE: Plan Check # 05-355
Project: Regal Homes SFR
Project Address: 22808 96�h PI W.
During re -review of the above noted application, it was found that the following information,
corrections, or clarifications are needed.
1) ok
2) ok
3) ok
4) Still Need from Geotechnical Engineer of Record. Special inspections are required for the
following. Complete the enclosed special inspection agreement signed by the owner, the general
contractor and the special inspector and submit to the City for approval prior to issuance.
• Soil bearing verification
• Proof rolling
• Placement of fill and compaction
• General site monitoring by Geotechnical Engineer of Record
• Final report from Geotechnical Engineer of Record
• Soil Nail
5) Items #5, 6 and 10 response said "No Changes". Please provide more detailed response in
order to address these items. See attached structural comments from city consultant. Respond to
each item in writing.
6) New: Per letter froxn Dennis M. Bruce, P.E. Dated May 5, 2005 soil nailing will take place.
Show location of soil nailing on the site plan as well as mentioned proposed easement
referenced in letter. Soil nail design will be sent out for peer review at applicants expense.
7) New: Provide 3 copies of all referenced reports, plans and photos noted in geotechnical review
letter from Dennis M. Bruce, P.E. dated May 5, 2005.
8) New: Owner to provide City with letter specifying who will act as Geotechnical Engineer of
Record (Dennis M. Bruce, P.E., Earth Consultants or Golder Associates). The Geotechnical
Engineer of Record needs to submit a letter stating that they have reviewed all the submitted
Geotech reports and all construction plans and they agree with the recommendations or to
specify any further recommendations or clarifications they may have.
Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a
written response to each of the above items to a Permit Coordinator.
Regal Homes
Plan: Oxford - 4
22808 96"' PL_ W
Plan Review Number 05-355
Page 2 of 3
EECE # ED05-48
All features were checked only to the extent allowed by the submittals provided.
All portions of this project are assumed to meet or will meet other departmental
requirements, conditions and concerns before permit approval.
STRUCTURAL COMMENTS
General
Sheet 3 Upper Floor Plan.
GrPlease provide a detail on the drawings for the '/z wall that is required to be a
guard. The code requires this wall to resist 200 pounds applied in any direction.
8301.5
Sheet 4 Foundation Plan
Od/Please specify the post to use at the 4X 10 beam. Also at the splice the size of
the post should be specified. R502.9 IBC 2304.9.7
Ok Please provide the connection of the post to the beam on the drawings. I was
unable to find where this was called out. Also typical there is not enough
bearing for the beams at the splice so the columns are increased to 4x6 at these
locations. Provide analysis that this is not required. R502.9, IBC 2304.9.7
Sheet 5 Lower Floor Framing Plan
(5)Plea'se specify the connection of the 5-118X9 glu-lam beam at each end. R502.9,
IBC 2304.9.7
Regal Homes
Plan: Oxford - 4
22808 96`h PL. W
Plan Review Number 05 -3 55
Sheet 6 Upper Floor Framing Plan
Page 3 of 3
EECE # ED05-48
All the details on the drawing assume the joist will be either bearing on a beam
or a post. This is not all the case. Some areas show the beam to be flush with
the joist. Please specify the hanger to use at these locations. For example at the
4X12. 8301.1, IBC 2304.9.6
urrently as shown, how are the lateral loads being transferred at the stairway?
With the as
below and the stairway this causes the horizontal diaphragm
to be three sided and not four sided as analyzed. Please modify drawings to
account for a three sided diaphragm or add a resisting element to transfer the
loads. IBC 2305.2
Sheet 8 Details
rovide analysis for the deck guardrail. Also it appears there is not a deck for
this house. Please clarify if this is going to be used for this projeet.R301.5
Sheet 9 Details & Schedules
Provide an analysis for the double 2X in lieu of single 3X. This is called out in
footnote 3 and footnote 7. Or, specify a 3X and not double 2Xs. The code
specifically states to use a single 3X member for these conditions. IBC
*3105.3.10 and 1BC table 2306.4.1 foot note i.
tail 1: Details state raised stem wall per plan, but the plan does not have this.
using the minimum of 28 inches then the height to width will not meet the
nimum of 3.5 to 1. Please modify accordingly. IBC table 2305.3.3
Additional corrections may be required following receipt of corrections and
additional information as requested.
Your plans are being reviewed concurrently with the Building Department, Fire
Department, Zoning Department and Public Works Engineering. Changes,
clarifications or additional corrections may be required subsequent to the Building
Department plan review when comments are received from the other concerned
departments.
Should you have any inquiries regarding this letter, please contact Hoyt Jeter at
(253) 857-4151 between 8:00 a.m. and 5:00 p.m.
52
Hoyt Jeter, P.E.
President
CITY OF EDMONDS
SPECIAL INSPECTION AND TESTING AGREEMENT
The project at 2_-2nop qo/t 1;U 0 issued under building permit
number requires special inspection and/or testing per IBC Chapter 17. The
complete list of special inspections is attached to this document.
BEFORE A PERIVIIT CAN BE ISSUED: The owner and contractor and special inspector shall complete
this agreement and the attached structural test(s) and inspections schedule including the required
acknowledgements.
APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building
Official prior to performing any duties or inspections. Each special inspector shall submit Statement of
Qualifications to the Building Official for review. Special inspectors shall display identification when
performing special inspections on site. Special inspection and testing shall meet the minimum requirements
of IBC Chapter 17 and the following:
A. Duties and Responsibilities of the Special Inspector
.I. Observe Work
The special inspector shall observe the site work for conformance with the approved (stamped) plans
and specifications and applicable workmanship provisions of the IBC. Architect or Engineer
reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be
performed on a continuous basis—meaning that the special inspector is on site at all times observing
the work requiring special inspection. Periodic inspections, if any, must have prior approval by the
City based on a separate written plan reviewed and approved by the Building Official and the
engineer or architect of record.
2. Report Non -conforming Items
The special inspector shall bring non -conforming items to the immediate attention of the contractor
and note all such items in the daily field report. Any item not resolved in a timely manner shall be
immediate cause of the special inspector to notify the Building Official of the plan deviation, error,
change or omission. It shall also be the duty of the special inspector to promptly notify the engineer
or architect.
3. Complete Daily Reports
Each special inspector shall complete and sign both the special inspection record and the daily report
form for each day's inspection. These records shall remain at the jobsite with the contractor for
review by the City Building Inspector.
4. Furnish Weekly Reports
The special inspector or inspection agency shall furnish the City with weekly reports of tests and
inspections. The project engineer or architect, and others as designated shall also be copied on
reports. Weekly reports must include the following:
• Description of daily inspections and tests made with applicable locations
• List of all non -conforming items
• Report on status of non -conforming items (resolved or unresolved)
• Itemized changes authorized by the Architect, Engineer and City if not included in non-
conformance items.
5. Furnish Final Construction Report
The special inspector or inspection agency shall submit a final signed report to the City stating that
all items requiring special inspection and testing were fulfilled and reported. And, to the best of
L_ITEMPIBUILDING1SpeciallnspectionAgreementIBC_doe 7/04
his/her knowledge the project is in conformance with the approved plans and specifications,
approved change orders and the applicable workmanship provisions of the TBC. Items not in
conformance or unresolved items or any discrepancies in inspection coverage, (Le., missed
inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically
itemized in this report.
B. Contractor Responsibilities
1. Notify the Special Inspector
It is the duty of the contractor to notify the special inspector when work is ready for special
inspection. Note, the items listed on the attached schedule and as noted on the approved plans and
specifications are required to have special inspections. Adequate notice shall be provided by the
contractor so that the special inspector has time to become familiar with the project.
2. Provide Access to Approved Plans
The contractor is responsible for providing the special inspector access to approved plans at -the
jobsite.
3. Retain Special Inspection Records
The contractor is responsible to retain at the jobsite all special inspection records submitted by the
special inspector. These records are to be provided to the City building inspector upon request.
C. City of Edmonds Building Department Responsibilities
1. Approve special inspectors or inspection agencies
The building department shall approve all special inspectors and special inspection requirements.
2. Monitor special inspection and approve weekly reports
Work requiring special inspection and the performance of special inspectors shall be monitored by
the City Building Inspector. Fi is/Her approval must be obtained prior to placement of concrete or
other similar activities in addition to that of the special inspector.
3. Issue Certificate of.Occupancy
The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports
including the final report have been submitted and accepted.
D. Owner Responsibilities
The project owner or the engineer or architect of record acting as the owner's agent shall fund
special inspection services.
E. Engineer or Architect of Record Responsibilities
The engineer or architect of record shall include special inspection requirements on the plans and
specifications.
ACKNOWLEDGEMENTS
I have read and agree to comply with the terms and conditions of this agreenzent.
Owner
Special Inspector
General Contractor
City Building Official
L_1TEMPIBUILDING1SpecialinspectionAgreementlBC_doc 7104
Date
Date
Date
Date
SPECIAL INSPECTION' AND TESTING SCHEDULE
MtGYECT � R I ES1 MqNSPECn3N AGEN y StEcrwX wsrEctM
REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR STRUCTURAL STEEUWELDING.
Conertte Guafte (gone Mortar — Sample- attd Test (list specific manbers below)
Aggregate Tests — Shop Material Identification
Reinforcing Tests — Weiding Inspection Q Sbop Q Field
Mix Desigm — tfltrasonic Inspection 0 Shop Q Field
Reinfom y Placement High-strength Bolting
Batch Plant Inspection lnspft- iHm Q Shop Q Field
inspect Placing Q A325
Cant Samples Q A490
0 QX OF
Pick-up Samples — )Metal Deck Welding Inspection
Compression Tests Reinforcing Stec) Welding Inspection t
— Meat Stud Welding InspccG�
PRECASTIPRESTRESSED CONCRETE: — Concrete Resect Wclding In
Piles Post -Te Pre-reas Cladding
AggrcgatcTcsts
Reinforcing Tests
Tendon Tau
Mu Desi¢as
Reinforcing Placcmcnt
loser: Placement
Conroe. Batching
Concrete Placcmcnt
lnvaliation Inscpcuon
Cast Samples
Pic) -ttp Samples
Compression Tests
FIREPROOFING:
— Placement Inspection
— Density "Pests
- Thickness Tests
— Inspect Batching
INSULATING CONCRETE:
Sample and Tc.s[
— Placement Inspection
_ Unit Wughts
FILL MATERIAL:
MASONRY:
— Acceptance Tests
— Placement Inspection
— Special Inspection Sursscs Used
— Field Density
— Prclimitraty Acceptance Tests (Masoary Units, Wall Prisms) '
_ Subscgttent Tests (Mortar. Grout. Ficid WaR Prisms)
STRUCTURAL WOOD:
— Placement lmp[ction of Units
— Shear Wall Nailing Inspection
— Inspection of Glu -lam Fib_
Inspection of Truss loin Fab,
ADDITIONALINSTRUCTIONS OR OTHER TESTS
— Sample and Test Componemts
AND INSPECTIONS:
Form completed b)r Tttle: