20061116100957.pdfTO: Charlie Nathan Nathan Construction FAX: 425-771-7105 FROM: Ann Bullis, Assistant Building Official RE: Permit # 2006-0412 Project: Employee Benefits of America Project Address: 22817 102nd Pl. W During review of the following documents it was found that information, clarifications or changes are needed. Please submit the revisions and additional reports to Marie Harrison, Permit Coordinator. • Structural special inspection reports from MTC received 11/15/06 (last report received was 11113106) • Deferred shop drawing submittals received 11/15/06 • FAX received 11/15/06 showing staked gridlines by surveyor 1. MTC Special Inspection Reports a. Report C6037 cast date 7/25/06: Inspectors remarks state that the trash enclosure walls were changed from CMU design to poured reinforced concrete walls and that engineer's review is required. Submit revision for the concrete walls, stamped and signed by the structural engineer (2 sets). Submit report from MTC that reinforcement and concrete were inspected per the structural engineer's revised details. b. Reports F17272, F16550, & F19280: Hold down and anchor bolt issues must be addressed by structural engineer of record and revisions submitted to the City for approval. c. Report F17286 dated 11111106: Submit letter from Structural engineer of record that he has reviewed this MTC report and stressing log as requested by MTC. d. Submit MTC special inspection reports showing these issues inspected and resolved. 2. Geo Group NW Special Inspection Reports: a. The City has received special inspection reports 1 through 7 (last report dated 12119105) for shoring installation (pile and lagging installation) only. Provide all remaining reports, including follow-up special inspection report for over excavation noted in report #7, and reports for additional required special inspections (see coversheet of approved plans) for site dewatering, subsurface drainage, placement of City of Edmonds o� EDS PLAN REVIEW COMMENTS BUILDING DIVISION Fst. sago (425) 771-0220 DATE: November 16, 2006 TO: Charlie Nathan Nathan Construction FAX: 425-771-7105 FROM: Ann Bullis, Assistant Building Official RE: Permit # 2006-0412 Project: Employee Benefits of America Project Address: 22817 102nd Pl. W During review of the following documents it was found that information, clarifications or changes are needed. Please submit the revisions and additional reports to Marie Harrison, Permit Coordinator. • Structural special inspection reports from MTC received 11/15/06 (last report received was 11113106) • Deferred shop drawing submittals received 11/15/06 • FAX received 11/15/06 showing staked gridlines by surveyor 1. MTC Special Inspection Reports a. Report C6037 cast date 7/25/06: Inspectors remarks state that the trash enclosure walls were changed from CMU design to poured reinforced concrete walls and that engineer's review is required. Submit revision for the concrete walls, stamped and signed by the structural engineer (2 sets). Submit report from MTC that reinforcement and concrete were inspected per the structural engineer's revised details. b. Reports F17272, F16550, & F19280: Hold down and anchor bolt issues must be addressed by structural engineer of record and revisions submitted to the City for approval. c. Report F17286 dated 11111106: Submit letter from Structural engineer of record that he has reviewed this MTC report and stressing log as requested by MTC. d. Submit MTC special inspection reports showing these issues inspected and resolved. 2. Geo Group NW Special Inspection Reports: a. The City has received special inspection reports 1 through 7 (last report dated 12119105) for shoring installation (pile and lagging installation) only. Provide all remaining reports, including follow-up special inspection report for over excavation noted in report #7, and reports for additional required special inspections (see coversheet of approved plans) for site dewatering, subsurface drainage, placement of fill and compaction, soil bearing verification, and general site monitoring during wet weather construction. Please provide. 1 Shop Drawings: a. The shop drawings from Post -Tensioning Institute are not stamped and signed by the engineer (Diana j. Leonard, PE) and do not contain the shop drawing approval stamp by the Structural Engineer of Record. Please provide. b. Shop drawings were not received for the structural steel and embedded items. Please provide. c. Shop drawings for the prefab guardrails must be submitted to the City before installation. 4. FAX showing staked gridlines by surveyor: a. The staked gridline plan is inadequate to show that minimum required setbacks are met. The plan must show the distances from the exterior wall of the building to each property line at the closest point per the approved site plan, and must be stamped and signed by the surveyor. It must also reference the project and address of the site. (Building Inspector corrections dated 1117/06 and 11/15106). b. The staked gridline plan is also inadequate to show that the building does not exceed the maximum allowed height as shown on the approved site plan. In a letter or plan, the surveyor must reference the datum/benchmark on which the height calculations were based (shown on the approved site plan.), and the actual elevation of the highest portion of the building (based on that datum). If there is an elevator penthouse or any other structure above the main roof line, the elevations of these structures must also be noted. The surveyor must stamp/sign the letter/plan. Page 2 of 2