Loading...
20061120095000.pdfor Epi City of Edmonds 0 PLAN REVIEW COMMENTS BUILDING DIVISION Fsr t g90 (425) 771-0220 DATE: November 20, 2006 TO: Michel Construction Inc. michelbz@nwlink.com FROM: Jenny Readwin, Plans Exa ner RE: Plan Check # 2006-0794 through 006-0801 Project: 8 SFR Development Project Address: 82r6 and 212th During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Soils reports must be site specific. Soil test pits and logs are required for each site. Please provide. They can not be from adjacent site. Soils report from Dent -lis M. Bruce, PE dated June 21, 2006 specifies that 4 test pits were dug. Provide site plan from Dennis M. Bruce, PE showing test pit locations as well as soil logs for each test pit as required by TRC chapter 4. 2) ok 3) ok 4) Some eaves are still not shown on the site plan. Please revise to clearly show all eaves. Show all eaves on the site plan along the driveway entrance. 5) ok