Loading...
20061168 edmonds-woodway hs 212 (20061116105106.pdf).pdfEdmonds High School Fields Erosion & Sedimentation Control Checklist 1 Will work entail, Yes No a Grading Permit? X a Clearing Permit? > 500 lineal feet of trench excavation? vmrk in a Critical area? If all answers to 1 are no, ESC plan not required. Otherwise continue below. 2 A) Separate Plan depicting ESC devices B) Limits of disturbed area C) Perimeter control, protection of adjacent areas D) Existing & Proposed Contours E) Location of construction entrance and detail F) Identify Drainage features, streams, wetlands,seeps, swales, etc G) Show cut & fill slopes, indicating top/bottom of slope/catch lines H) Conveyance System 1) Locate drainage pipes, ditches, swales, cut-off trenches 2) Temporary Pipe Inverts, or minimum slope & cover 3) Grades, dimensions, location, flow direction for ditcheslswales 4) Bypass details for off -she runoff 5) Locations and outlets for Dewatering systems Other J) Provide ESC notes 1) Stabilization of exposed areas (verbatim by code) 2) Other measures as needed to limit sediment Impacts 3) Inspection & Maintenance of ESC devices & CBs 4) Seeding, mulching, matting requirements 5) Stockpiling location & protection 6) Street sweeping 7) Construction access 8) Vehicle leaning to prevent tracking 9) Dust Control 10) Other K) Construction Sequence 1) Preconstruction Meeting 2) Call for Utility Locations 3) Review ESC notes 4) Flag Clearing Limits 5) Installation of ESC devices 6) CB protection 7) Grading Activities 8) Reference stabilization of exposed area requirements 9) Utility Activities 10) Removal of ESC devices only after Stabilization 11) Other L) Other Yes No 3 Land disturbing activities greater than 1 acre? X If all answer is no, end of checklist. Otherwise continue below. Sediment Trapping 1) Sized per DOE or King County SWM manual 2) Berm Width and Slope inside & outside slopes 3) Storage info., depth, length, width 4) Conveyance to Trapping Facility 5) Typical Section View 6) Typ. details of gravel cone, standpipe, filtering devices 7) Detail control/restrictor device location & details 8) Mulch and/or cover of berms and slopes 9) Rock check dams, spacing, sections 10) Stabilization techniques 11) Overflow Spillway 12) Other complete Incom late Comments X X X X X X X X Need Interceptor swale detail X Need Interceptor Swale detail XCf�F�n�nfinn n( n.•....�eA e.e�� ,•o .. ,•.. ,. o X X X XAddress Utility Locations call out in Sequence X X X XAddress Street Svreeping in Notes X X XAddress Vehicle Tracking Measures in Notes X XAddrss Dust Control Measures in Note X X XAddress Utility Locations call out in Sequence X X X X X X X X EDMONDSWooDwAYHIGH SCHOOL FIELDRENovA-nON OWNER: EDMONDS SCHOOL DISTRICT — DEPARTMENT OF ATHLETICS TERRI MCMAHAN, DIRECTOR 20420 68TH AVENUE WEST LYNNWOOD, WA 98036 PHONE 425-670-7151 FAx 425-670-7323 � LANDSCAPE ARCHITECT: CASCADE DESIGN COLLABORATIVE, INC. f tee~ KAs KINKEAD, ASLA, RLA 91 1 WESTERN AVENUE, SUITE 2 10 SEATTLE, WASHINGTON 98104 PHONE 206-628-9133 FAx 206-292-8824 OCTOBER 2006 PYRAMID ENGINEERING LLC RECEIVED OCT 12006 BUILDINIG DEPARThAIEN-1 CITY OF EWONDS — Temporary Sediment Trap Sizing Calculations _ _— --! Per 1992 DOE Stormwater Management Manual — — — -- _ 'Project Name: Edmonds Woodway High School -- ojecumber: C Prt NDC-EWHS-06-01 - — _ -Facility Description: TESC trap — - ---� -- ,The temporary sediment trap volume can be found — by computing the _ detention volume required for the 2 -year, 24-hour design storm. Please_ refer to page II -5-94 of the 1992 DOE manual. ___— __-- -- — Existing and proposed conditio�thisproj&ctareLp_ervious,therefore_ detention isnot required for this project and the calculated trap volume -would be zero. The City of Edmonds personnel have requested a — _ sediment trap be installed. The trap designed for this site has 1875 square feet of surface area and is 3 feet deep from the bottom of the _ to the Z - — — _sump outlet. Outflows from the trap will flow into an existing j catch basin in the northwest corner of the site. Catch_ basin protection this catch basin will be provided. j --- — —for � ( 1 J ���4 .4 ,�� F �`°`��`� �_ 1� �^c� F��:� f(� � �J �� �f 1 j �----t°'4-�`"�y ��E•#"� ,[�_ lei � •""" 3/ �.��'i �..� � F ('� r` �._.."'i`,�j�.wk-- � � �. � 4- � ( 1 J C:\AutoCAD-Temp\CDC-Woodway\Reports\EWHS-TESC-Trap 10-10-06.x1s 10/10/20064:16 PM