Loading...
20061212115324.pdfQF EDS Cityof Edmonds O tpPLAN REVIEW COMMENTS BUILDING DIVISION gst 1 goo (425) 771-0220 DATE: December 12, 2006 TO: Rob Van Tassell michellevantassell@cbbain.com FROM: Jenny Readwin, Plans Exam' er RE: Plan Check 4 2006-0677 Project: Vantassell Project Address: 2344' Ave N During review of the above noted revision, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the above items to a Permit Coordinator. 1) Provide revised later calculations from Engineer of Record for revised shear walls. 2) Foundation plan on sheet 5 does not meet revised foundation plan signed September $th and stamped by the Engineer of Record. Please coordinate plan or have Engineer of Record review new plan and stamp and sign.