Loading...
20061213165400.pdfof Eng Citv of Edmonds o "� xd PLAN REVIEW COMMENTS BOLDING DIVISION Fsf. ts9D (425) 771-0220 DATE: November 6, 2006 TO: Regal Homes Fax (425)290-9941 FROM: Jenny Readwin, Plans Exami er RE: Plan Check # 05-355 Project: Regal Homes SFR Project Address: 22808 96"' PI W. During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. 1) ok 2) ok 3) ok 4) ok 5) 11/6/06 responses say changes made on plans but these sheets have not be resubmitted and no redlines have been made. Please add this information to the drawings. 11/1/06 Still need. No response given Items #5, 6 and 10 response said "No Changes': Please provide more detailed response in order to address these items. See attached structural comments from city consultant. Respond to each item in writing. 6) 11/6/06 Response says that they (Regal Homes) remove all references to soil nailing. This must be done in a letter stamped by Dennis M Bruce P.E. otherwise this item still needs to be addressed. 1111106 Still need. No response -iven New: Per letter from Dennis M. Bruce, P.E. Dated May 5, 2005 soil nailing will take place. Show location of soil nailing on the site plan as well as mentioned proposed easement referenced in letter. Soil nail design will be sent out for peer review at applicants expense. 7) 11/6/06 We still need copies of 1) Report from D. Bruce, P.E. dated April 30, 2001 2) Golder Associates Geotech_Report for Valhalla, LLC dated October 4, 2004 3) Section views by A.D. Shapiro, Architects and. 4)_Site photog gpli_s_ which were all mentioned in geotechnical review letter from Dennis M. Bruce, P.E. dated Mav 5. 2005. Please provide 3 conies of all referenced reports. 1111/06 Still need. No response uiven New: Provide 3 copies of all referenced reports, plans and photos noted in geotechnical review letter from Dennis M. Bruce, P.E. dated May 5, 2005. 8) ok Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the above items to a Permit Coordinator.