Plan Review Comments – Planning Division
Plan Check #:
BLD-2006-1298/1299 (Third Review)
Project Name: Darryl & Carolyn Belanich Duplexes
th
Project Address: 7510/7512 210 Street SW (RM-2.4 Zone)
July 19, 2007
Jordan Kostelyk
th
15314 28 Drive SE
Mill Creek, WA 98012
Phone: 425.775.6739 | Fax: 206.374.8274
Dear Applicant,
I have reviewed the above building permit application for the Planning Division and it was found that the
following information, corrections, or clarifications will need to be addressed before review can continue:
Height:
1. The plans only show one of the duplex buildings. However, since the original grade is
different along the site, the two building have two different height calculations (which you show on
the site plan – thank you). Please show this info on the elevations as well for both of the buildings
(you can label them bldg #1 and bldg#2 if it’s easier for you). For both buildings, please show the
following on the Front Elevation of page 1: (1) Average Original Grade of each of the buildings, (2)
Max Height of each of the buildings, and (3) Actual Height of each of the buildings. Please make
sure these figures match what is shown on the site plan (and if not, please revise to make consistent –
redline is acceptable).
2.Rockery:
Planning measures the height of rockeries from the top of the rock to original grade
(sometimes, when cut into a slope, a rockery could have a height of zero). If the rockery is over three
feet in height, as measured from top of rock to original grade, then it cannot be located within the
setback area because at that point it is considered a “structure”, and structures are not permitted in the
setback area. Please help me determine the height of the rockery as measured from top of rock to
original grade. Please note these elevations on the site plan (redline is acceptable).
Thank you for your cooperation. Please redline plans or submit three sets of revised plans/documents
(affected sheets only) with a written response to each of the above items. Please make all submittals to
the Development Services Permit Coordinator (Theresa Umbaugh) Monday through Friday, 9am to noon
or 1pm to 4pm. If you have any questions, please do not hesitate to contact me at (425) 771-0220,
extension 1778. I look forward to working with you on this project.
Sincerely,
CITY OF EDMONDS
Gina Coccia, Planner