Loading...
20061298-20061299 Belanich duplexes_4_.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections # bld20061298 & bld20061299 September 26, 2007 Application : Date: th Belanich / 7510 & 7512 210 St SW Project Name/Address: Jordan Kostelyk / e-mail: jordyk@earthlink.net Contact Person/Address/Fax: Reviewer: Jeanie McConnellDivision:Engineering During review of the subject submittal it was found that the following information, corrections, or clarifications will need to be addressed: GENERAL 1.ok 2.ok 3.ok 4.9/26/07 – To date a revised traffic control plan (TCP) has not been submitted. Engineering cannot sign off on the building permit until the TCP has been reviewed and approved. – Traffic control plan was submitted, thank you. Please revise the traffic control plan to include 8/3/07 o road construction ahead signage, flagger signage and placement of flaggers. This will be required during the paving operation. 5.ok 6.ok 7.ok 8.ok 9.9/26/07 – A performance will need to be submitted prior to issuance of the building permit. – Please submit a performance bond for all right-of-way improvements in the amount of 8/3/07 o $29,541.55. Bond forms can be obtained from Theresa Umbaugh, Permit Coordinator. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. 1 of 1 DATE E-MAILED 9/26/07 PAGE