Loading...
20061342 pt edwards bldg 9 grdg.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Comments Plan Check : Date: # 20061342 15 Jan 07 Project Name/Address: Pt. Edwards: 45 Pine St Contact Person/Address/Fax: fax/e-mail : Ross Woods : ross@triaddev.com Reviewer: Division:Engineering Lyle Chrisman, Engineering Program Manager The subject application has been reviewed but cannot be completed until the following items have been addressed/corrected. Please resubmit 3 sets of revised drawings to a Development Services Permit Coordinator. Sheet 4 1. Provide grading quantities. 2. Construct a sediment trap for temporary 8” storm stub to cb 15. Sheet 4G 3. Temporary rock lined interceptor swale shall also be visqueene lined to minimize muddy water into the cb’s. 4. Suggest placing an acp berm east side of loop road to keep pavement runoff from entering the site. Shee 4H 5. All X-sections details that have 1.5:1 final grade slope: Need letter from Geo-tech approving less than 2:1 slope. 6. X-section EE: The slope of the finished grade between building and loop road is steeper than 2:1. Needs some sort of retaining structure keep erosion off the road and to insure final grade is 2:1 max. __________________(Attach fax transmittal) DATE FAXED PAGE ____ OF ___ C:\\Users\\cockrum\\AppData\\Local\\Temp\\20061342 pt edwards bldg 9 grdg.doc_153710\\20061342 pt edwards bldg 9 grdg.doc