Loading...
20070109142536.pdfov EDS City of Edmonds o PLAN REVIEW COMMENTS s''}'` BUILDING DIVISION �SI g90 (425) 771-0220 DATE: January 9, 2007 TO: Luke Hagler Charter Construction, Inc. FAX: 206-38.2-0450 FROM: Ann Bullis, Assistant Building Official RE: Plan Check #2006-0991 Project: Third Avenue Plaza -- Reroof Project Address: 120 3`d Ave S During re -review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please submit written responses to each comment.and revised plans/documents to Theresa Umbaugh, Permit Coordinator. 1. Previous item 2: As noted in my previous comments and discussion with Mark Fowler of SGA, since the City has no record of this work as part of the original building construction, a permit must be obtained to legalize the work, including construction plans stamped and signed by a State licensed Architect or Professional Engineer, including dimensioned floor plans, roof plan, framing plans, construction sections, fire rated construction details, elevations, etc. The sketches submitted were incomplete and were not stamped and signed. Since the "roof deck" area is now enclosed, it appears that sleeping room egress and exiting may be affected. The architect shall review the impact that enclosing this area has on exiting, sleeping room egress, and other possible code issues, and include with the next resubmittal. To determine fees for the remodel work, submit a cost estimate from the architect for the work that was done. Should any additional work be required to alter the non -permitted construction for code compliance, please submit a separate contractor's bid.