PLAN REVIEW COMMENTS
s''}'`
BUILDING DIVISION
�SI g90 (425) 771-0220
DATE: January 9, 2007
TO: Luke Hagler
Charter Construction, Inc.
FAX: 206-38.2-0450
FROM: Ann Bullis, Assistant Building Official
RE: Plan Check #2006-0991
Project: Third Avenue Plaza -- Reroof
Project Address: 120 3`d Ave S
During re -review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Please submit written responses to each comment.and revised
plans/documents to Theresa Umbaugh, Permit Coordinator.
1. Previous item 2:
As noted in my previous comments and discussion with Mark Fowler of SGA, since the City has no
record of this work as part of the original building construction, a permit must be obtained to
legalize the work, including construction plans stamped and signed by a State licensed Architect or
Professional Engineer, including dimensioned floor plans, roof plan, framing plans, construction
sections, fire rated construction details, elevations, etc. The sketches submitted were incomplete
and were not stamped and signed.
Since the "roof deck" area is now enclosed, it appears that sleeping room egress and exiting may be
affected. The architect shall review the impact that enclosing this area has on exiting, sleeping room
egress, and other possible code issues, and include with the next resubmittal.
To determine fees for the remodel work, submit a cost estimate from the architect for the work that
was done. Should any additional work be required to alter the non -permitted construction for code
compliance, please submit a separate contractor's bid.