PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: January 22, 2007
TO: Mike Massey
Fax 425-438-8850
FROM: Jenny Readwin, Plans Exam' er
RE: Plan Check 4 2006-1340
Project: Sherin SFR
Project Address: 9407 232nd St SW
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents (affected sheets only) with a written response to each of the items below to a
Permit Coordinator.
1) Show proposed keystone wall on the site plan and provide top and bottom wall elevations at 5'
intervals.
2) On the site plan clearly distinguish between existing grades, proposed grades and easements.
Currently they are all shown with the same dashed line and it is very confusing where they
overlap.
3) Short plat survey shows a 10' access and utility easement strip along the West property line (94th
Place). Please add to site plan.
4) Short plat survey shows the 10' PUD easement along the East property line wrapping around to
the North property line. Please also add this to the site plan.
5) On the site plan label covered porch and show all concrete patios and landings and fireplace
bumpout.
6) Please complete the enclosed vapor barrier/slab insulation page of the Energy Form. This page
was left blank.
7) Provide calculation for garage man door header with point load from GB 1,
8) Specify bolting/nailing for GB2 (4) 2x12.
9) Provide calculation for 4x8 floor beam under the foyer/powder room with point load from B3 as
well as the 4x10 power room beam.
10) No foundation support is specified under the 4x 10 hall beam near the nook or at the 4x 10 hall
beam at the stairs. Clarify how all loads are carried to bearing at these locations.
11) Provide calculations to justify that a larger footing is not required at both sides of GB3.
--COR BARRIERS shall be installed toward the warm surface as represented below (select one)-
Floors: Kraft Faced Unfaced insulation with
batt insulation � Plywood Sheathing
polyethylene (4 mil) El (Exposure 1 or exterior grade)
Walls: Face stapled Unfaced insulation with
batt insulation polyethylene 4 txtil ❑
Vapor Retarding Paint
Ceilings*: Face stapled ❑ Unfaced insulation with
batt insulation polyethylene (4 mil) ❑ Vapor Retarding Paint
*NOTE: Vapor Barrier not required where ventilation space averages 12" or greater above the insulation
SLAB INSULATION shall be R-10 minimurn and be located on the: ❑ Exterior ❑ Interior
SLAB INSULATION EXAMPLES
NOT CONSTRUCTION DETAILS
Floating Slab with Interior insulation
Silicone Caulk Seal
4" Concrete Slaty
11111-7 71I�1J=_-_ _-_-;� llllw11 l'E-7rte ll10 6milpoly
11111=II f 11111 = - 11111=!1111=I =1111!
11111=1111(-�_ 111!1-_11111=ll
11!)1=1111111111 J =11111=11111=111 4" Gravel Base
91!1111=
—
11111 --`-- --- ---=-=-1=11!11-1
11111=I1llllllJ=IIl11111J R-10 insulation
24" minimum or
to frostline
Floating Stab on Grade w/Interior Slab Insulation
Silicone Caulk Seal
Thermal Break
4" Concrete Slab
11111=1i _ -
__
I1111�1111 =�'"r-
llfll�llll s=�_ = 1111=1111= l�lf— 11� s mil poly
1111�_If_r-_=11111=11111=_11111=1iT1— II
11111�1}lI-_` =lull=_11111=11111=_11111— R-10lnsulation
lull= =___:=__11(11=I1l11=11111=1(111=11111 24' minimum
=11111 . s =X11111-_11111-11111-1111-
___ _____�=�11111`11i11�1111111i1I
—
=-�=``�`
11111�1111f�11i1l=dull--
L:UEMPlB(AL01NG111AND0(IT tCODESIENERGY B26.DOC
Last Date Revised- 3/1/2006
Floating Slab with Exterior Insulation
Flashing/Protection
Silicone Caulk Seal
/ 4" Concrete Slab
�l I
lil_IIIII_ 6milpoly
fl F11 1
111=IIII1=
11111=1I11I
li=ll�ll-
�IIl1��
IIS
R-10 insulation
24" minimum
or to frostline
Below Grade Wail with Interior Insulation
Silicone Caulk Seal
HEATED
BASEMENT
4' Concrete Slab
N Il l fi mil poly
Thermal Break