Loading...
20070122115201.pdfaF EDS City of Edmonds o f� PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: January 22, 2007 TO: Mike Massey Fax 425-438-8850 FROM: Jenny Readwin, Plans Exam' er RE: Plan Check 4 2006-1340 Project: Sherin SFR Project Address: 9407 232nd St SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Show proposed keystone wall on the site plan and provide top and bottom wall elevations at 5' intervals. 2) On the site plan clearly distinguish between existing grades, proposed grades and easements. Currently they are all shown with the same dashed line and it is very confusing where they overlap. 3) Short plat survey shows a 10' access and utility easement strip along the West property line (94th Place). Please add to site plan. 4) Short plat survey shows the 10' PUD easement along the East property line wrapping around to the North property line. Please also add this to the site plan. 5) On the site plan label covered porch and show all concrete patios and landings and fireplace bumpout. 6) Please complete the enclosed vapor barrier/slab insulation page of the Energy Form. This page was left blank. 7) Provide calculation for garage man door header with point load from GB 1, 8) Specify bolting/nailing for GB2 (4) 2x12. 9) Provide calculation for 4x8 floor beam under the foyer/powder room with point load from B3 as well as the 4x10 power room beam. 10) No foundation support is specified under the 4x 10 hall beam near the nook or at the 4x 10 hall beam at the stairs. Clarify how all loads are carried to bearing at these locations. 11) Provide calculations to justify that a larger footing is not required at both sides of GB3. --COR BARRIERS shall be installed toward the warm surface as represented below (select one)- Floors: Kraft Faced Unfaced insulation with batt insulation � Plywood Sheathing polyethylene (4 mil) El (Exposure 1 or exterior grade) Walls: Face stapled Unfaced insulation with batt insulation polyethylene 4 txtil ❑ Vapor Retarding Paint Ceilings*: Face stapled ❑ Unfaced insulation with batt insulation polyethylene (4 mil) ❑ Vapor Retarding Paint *NOTE: Vapor Barrier not required where ventilation space averages 12" or greater above the insulation SLAB INSULATION shall be R-10 minimurn and be located on the: ❑ Exterior ❑ Interior SLAB INSULATION EXAMPLES NOT CONSTRUCTION DETAILS Floating Slab with Interior insulation Silicone Caulk Seal 4" Concrete Slaty 11111-7 71I�1J=_-_ _-_-;� llllw11 l'E-7rte ll10 6milpoly 11111=II f 11111 = - 11111=!1111=I =1111! 11111=1111(-�_ 111!1-_11111=ll 11!)1=1111111111 J =11111=11111=111 4" Gravel Base 91!1111= — 11111 --`-- --- ---=-=-1=11!11-1 11111=I1llllllJ=IIl11111J R-10 insulation 24" minimum or to frostline Floating Stab on Grade w/Interior Slab Insulation Silicone Caulk Seal Thermal Break 4" Concrete Slab 11111=1i _ - __ I1111�1111 =�'"r- llfll�llll s=�_ = 1111=1111= l�lf— 11� s mil poly 1111�_If_r-_=11111=11111=_11111=1iT1— II 11111�1}lI-_` =lull=_11111=11111=_11111— R-10lnsulation lull= =___:=__11(11=I1l11=11111=1(111=11111 24' minimum =11111 . s =X11111-_11111-11111-1111- ___ _____�=�11111`11i11�1111111i1I — =-�=``�` 11111�1111f�11i1l=dull-- L:UEMPlB(AL01NG111AND0(IT tCODESIENERGY B26.DOC Last Date Revised- 3/1/2006 Floating Slab with Exterior Insulation Flashing/Protection Silicone Caulk Seal / 4" Concrete Slab �l I lil_IIIII_ 6milpoly fl F11 1 111=IIII1= 11111=1I11I li=ll�ll- �IIl1�� IIS R-10 insulation 24" minimum or to frostline Below Grade Wail with Interior Insulation Silicone Caulk Seal HEATED BASEMENT 4' Concrete Slab N Il l fi mil poly Thermal Break