Loading...
20070123115011.pdfo� E� City of Edmonds o� PLAN REVIEW COMMENTS BUILDING DIVISION gst 1$90 (425) 771-0220 DATE: January 23, 2007 TO: Bill Kimler Kimco Plumbing FAX: 360-394-7705 FROM: Ann Bullis, Assistant Building Official RE: Plan Check #2006-0039 Project: Aegis -- Plumbing Project Address: 21500 72°a Ave W During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment and where changes can be found on the plans. Submit 2 sets of revised plans/documents (or "redline" plans currently on file with the City) to Theresa Umbaugh, Permit Coordinator. 1. Where additional fixture units are being added to a stack, provide a schematic showing DWV sizing and fixture units so that existing and proposed drain lines can be verified. Cross reference on the plans where each schematic applies. Where no additional fixture units are being added to an existing stack, no additional sizing information is needed, but clearly show where these areas are on the plans. 2. Note the pipe material for the DWV system. 3. At new underground drain lines, note the slope of the line. 4. Show potable water line layout where new fixtures will be added or altered. Note the pipe material. If the incoming water pressure is greater than 80 psi, a PRV is required where the water line enters the building. If a PRV is provided or if there is another device on the system that creates a closed system, expansion tanks are required on all of the water heaters. Note on the plans. 5. Show/label the cross -connection devices on the plans and provide manufacturer's cut sheet for each. Commonly commercial kitchens will have soap injection systems at the dishwasher, ice machines, carbonated beverage dispensers, etc. 6. Provide gas piping sizing calculations, pipe sizing and material. 7. There are some hand written notes on Sheet A3.lc that GA WP1051 to be used in lieu of WP3260 for the 1 -hour fire partition. If this is the case, the architect must submit a revision to the City for approval prior to the framing inspection. Be aware, assembly WP 1051 will require additional inspections by the City Building Inspector to verify the installation of the laminating compound. In the meantime, cross them off the plumbing plans since they do not apply. B55 city of edmonds development information Plumbing Permit Submittal Requirements PERMIT REQUIRED: A permit is required to install, alter, repair, relocate, or replace any portion of a potable or waste plumbing system. Including gas hot water tank replacement, water service line repair or replacement, propane tanks, and to install or alter gas piping. EXEMPT WORK: The clearing of stoppages or the repairing of leaks in drains, pipes, valves, vents or fixtures, and the removal and reinstallation of water closets, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures. CODES: Uniform Plumbing Code (Current Edition) International Fuel Gas Code (Current Edition) LPG per 2001 NFPA-58 and 2002 ANSI 2223.1/NFPA-54 FEE: Base fee $30 plus additional fees based on the number and type of plumbing fixtures plus $15 City surcharge fee SUBMITTAL REQUIREMENTS FOR NEW INSTALLATIONS: I . Plumbing Fixture Schedule Forth (See Handout #B, attached) �2 On a scaled floor plan show the following: Q Drain, Waste and Vent piping layout; sizing, slope and pipe material 0 Potable water line layout, sizing and pipe material Fixture unit and flow calculations to support line sizing Cross connection devices are required on all direct connections to the potable water system. Specify all fixtures that require cross connection devices (i.e., ice machines, soap ejection systems, beverage dispensers, boilers, etc.) and note the make and model of each device. 4_ Indicate the location and cross connection device for premise isolation *-1PAAAY-e7 (-i2AA ST - 5. Manufacturer's specifications for equipment such as sump pumps, ejector pumps, water heater Pa., boosters, etc. Gas piping layout, sizing and pipe material, pipe sizing calculations, maximum design operating pressure and location of pressure regulators For Commercial and Multifamily projects, provide Listed and Tested Fire Stoppm Assemblies �5 S t 'C— RE UREMENTS. IT IS NOT A COMPLETE LIST OF PERMIT OR CODE RE UIREMENTS AND SHOULD NOT BE USED AS A SUBSTITUTE FOR APPLICABLE LAWS AND REGULATIONS. IT IS TH6 RESPONSIBILITY OF THE OWINERIDESIGN PROFESSIONAL TO REVIEW THE SUBMITTAL FOR COMPLETENESS AND APPLICABILTrY TO OTHER CODES. ONLY COMPLETE APFLICATIONS WILL BE ACCEPTED BY THE CITY FOR REVIEW. L:1TEMPIBUILDINGIHANDOUT ICODES/PI.UMBING B55 8106