20070125092755.pdfofD City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DTVIS7GN
Fsr t s9° (425) 771-0220
DATE: January 25, 2006
TO: Steve Guthrie
15100 SE 38th Street, #101-714
Bellevue, WA 98006
FROM: Ann Bullis, Assistant Building Official
RE: Plan Check #: 2007-0054, 2007-0055
Project: Covey Coffee — Plumbing and Hydronic Heating/Mechanical
Project Address: 7525 212th Street SW
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please provide written responses to the comments below
and resubmit 2 sets of revised plans/documents to Theresa Umbaugh, Permit Coordinator.
1) Clearly show locations, types and model numbers for each existing and proposed cross
connection device on site after the City water meter. Within the building (based on the Tr plans
and plumbing plans), Reduced Pressure Backflow Assemblies are required at the ice machine,
espresso machine(s), hydronic heating system, car wash water supply (hot and cold), and
premise isolation (per Linda McMurphy, Water Quality Technician). Clearly show the entire
system on the plans so we can verify cross connection control is provided at all of these areas.