Loading...
20070205100702.pdfOF EDO City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION L'sr. 1,6P (425) 771-0220 DATE: February 5, 2007 TO: Andy Duffus andy_duffas@msn.com FROM: Jenny Readwin, Plans Ex mine RE: Plan Check # 2006-1232 Project: New SFR Project Address: 932 Alder St. During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised pians/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) ok 2) ok 3) ok 4) ok 5) 2/5/07 It has been my understanding that the holdowns for seismic and wind are not interchangeable (i.e. for F/FL North Wind requires SW4 and HDQ8 and Seismic requires SW7 and STHD14RJtherefore seismic governs and SW7 and STHD14RJare required. Please provide response from Engineer of Record and revise plans if necessary. Lateral calculations for Main Floor North specify STHD14RJ and plans call out HDQ$-SDS3. Coordinate plans with the calculations or provide revised calculations. The same thing occurs on the Main Floor South please also address this in the resub. 6) ok 7) ok 8) ok