20070205100702.pdfOF EDO City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
L'sr.
1,6P (425) 771-0220
DATE: February 5, 2007
TO: Andy Duffus
andy_duffas@msn.com
FROM: Jenny Readwin, Plans Ex mine
RE: Plan Check # 2006-1232
Project: New SFR
Project Address: 932 Alder St.
During re -review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
pians/documents (affected sheets only) with a written response to each of the items below to a
Permit Coordinator.
1) ok
2) ok
3) ok
4) ok
5) 2/5/07 It has been my understanding that the holdowns for seismic and wind are not
interchangeable (i.e. for F/FL North Wind requires SW4 and HDQ8 and Seismic requires
SW7 and STHD14RJtherefore seismic governs and SW7 and STHD14RJare required.
Please provide response from Engineer of Record and revise plans if necessary. Lateral
calculations for Main Floor North specify STHD14RJ and plans call out HDQ$-SDS3.
Coordinate plans with the calculations or provide revised calculations. The same thing occurs on
the Main Floor South please also address this in the resub.
6) ok
7) ok
8) ok