Loading...
20070210 Shubin SFR ESLHA_2_.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Application : Date: # bld20070210 September 28, 2007 Project Name/Address: Shubin / 16319 75th Pl W Contact Person/Address/Fax/e-mail: Erik Andersen / e-mail: eandersen@hwageo.com Reviewer: Jeanie McConnellDivision:Engineering Thank you for a very thorough resubmittal. The additional information pertaining to the detention system and the sizing of the additional pipe has been provided to Blaine Chesterfield, Storm Water Engineer for review and approval. Blaine will provide any additional comments to you by October 3, 2007. Please provide additional information, corrections or clarification for the following: 1.The proposed additional section of storm detention pipe has been shown to be located within the City right- th of-way (75 Pl W). The storm detention system shall be located on private property. City records indicate the 10’ area beyond the west property line, as shown with a dashed line on the civils, was dedicated to the City. Please revise the location of the proposed additional storm detention pipe to be on private property. 2.Please confirm with Blaine Chesterfield chesterfield@ci.edmonds.wa.us if one or two access manholes will be required with the new 60” diameter detention pipe. Cleanouts are not sufficient as they do not allow for proper maintenance of the storm system. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. I will be out of the office until DATE E-MAILED 9/28/07 PAGE(s) 1