Loading...
20070220153547.pdfof� City of Edmonds a PLAN REVIEW COMMENTS BUILDING DIVISION Fsr. g90 (425) 771-0220 DATE: February 20, 2007 TO: George Braslaw, AIA Archsoft Consultants 12006 98"' Ave NE, #204 Kirkland, WA 98034 FROM: Ann Bullis, Assistant Building Official RE: Plan Check #2007-0103 Project: Tenant Improvement Project Address: 180 Sunset Ave S During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment and where changes can be found on the plans. Submit revised plans/documents to Theresa Umbaugh, Permit Coordinator. 1. Revise address throughout plans to 180 Sunset Ave S. 2. Under the "permit review" box on Sheet AO it lists plumbing and kitchen equipment plan and list as included with this set of plans. These items could not be found in the plans submitted. Please provide for review. See enclosed plumbing submittal handout for minimum plumbing plan requirements. In addition to the information shown in the handout, clearly show the waste lines that will be routed to the grease interceptor (distinguish from other waste lines). 3. Enclosed is the City's Grease Interceptor handout. Follow the steps in the handout and submit for the grease interceptor. 4. The door schedule "remarks" column for door I OOA, I OOB, and 108A notes "special sign at door". Please provide wording of the sign. Over door 100B per IBC 1008.1.8.3 provide a sign stating "This door to remain unlocked when building is occupied" (minimum 1" high letters on contrasting background). Doors 100A with panic hardware are not required to have this sign since they can be opened at any time from the inside by use of the pushbar. 5 Revise reflected ceiling plan to match floor plan at north cooler/exit vestibule area. 6. Provide emergency lighting in the north exit alcove 7. Add illuminated exit sign to electrical symbols on Sheet AO and specify type of power backup (such as battery). 8. On floor plan show the chairs/seats and distinguish between fixed seats, bench/booth seats, and chairs (not fixed). 9. At Ieast 5% of the seating and standing spaces at the dining surfaces shall be accessible and be distributed throughout (IBC 1108.2.9.1). Show the calculation and location of accessible seats on the floor plan. 10. If there are any points of sale, order or pick-up windows where customer service is provided, they must be accessible (see ICC/ANSI A117.1 Section 904). 11. In addition to the Type I hood, Type H hoods will be required over cooking equipment and dishwashing equipment that produce heat or steam (IMC 507.2.2). If the dishwasher at the bar is an under -counter style, it is exempt from requiring a Type II hood (note clearly on plans). 12. Mechanical/HVAC has been listed as a separate permit on the coversheet of the plans, so review will be done at that time (handout enclosed for your use). Complete the existing HVAC system information for cfm and fresh air. 13. The accessible parking spaces and curb ramp at the walkway leading to the entrance of the tenant space do not appear to meet accessibility codes. Revise site plan to show 2 complying accessible parking stalls with access aisle and complying curb ramp. See ICC/ANSI Al 17.1 Sections 502 & 406 and enclosed handout 14. Revise stairway details to address the following: Stair rise cannot exceed 7", open risers are not permitted. IBC 1009.3 and 1009.3.2 15. Install bollard at end of handrail (drive aisle side) to prevent vehicle impact of stairway. Bollard cannot encroach into required stairway landing. 16. What utility equipment is located in the mezzanine above the restrooms? 17. Provide construction section detail of the water heater platform. Clearly show how all loads are carried to bearing. 18. Submit written contractor's bid for all work. Page 2 of 2