Loading...
20070247 Falcon Ridge SFR(2).doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Application : Date: # bld20070247 July 30, 2007 th Project Name/Address: Falcon Ridge / 8010 240 St SW Contact Person/Address/Fax/e-mail: Randy Munson / e-mail: rand.munson@comcast.net Reviewer: Jeanie McConnellDivision:Engineering During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a Permit Coordinator. JoAnne Zulauf is your City contact for this project. 1.ok – information only. 2.ok 3.ok 4.ok 5.Rockery plans and calculations have not yet been submitted to the City for review and approval. 4/19/07 comment - As this site is located within a critical area, the rockery shall be designed and stamped o by a licensed engineer. Plans and calculations shall be submitted to the City for review. In addition, peer review may be required. 6.Rockery footing drains have not been shown. House footing drains have been shown connected to the storm detention system. Please revise plans accordingly. 4/19/07 comment - Show the location of the footing drain tightline stub and cleanout provided at the o property line with the subdivision. The footing drain tightline system bypasses the storm detention system. Place a note on the plans that the stub was provided with the short plat. Rockery footing drains will be required and shall connect to the footing tightline system. Show the o point of connection on the plans. The house footing drains shall also tie into this system. Show the point of connection on the plans. o 7.The tightline system and catch basin in the driveway has been shown connecting to a storm line that bypasses the detention system. Also, please clarify tightline system – plans show a FD line, which is interpreted to be footing drain – is this the tightline system? 4/19/07 comment - Show the location of the storm stub and cleanout provided at the property line with o the subdivision. Place a note on the plans that the stub was provided with the short plat. The tightline system for the gutters and downspouts shall also make connection to this stub. Show o the point of connection on the plans. DATE E-MAILED 7/30/07 PAGE 1 of 2 The catch basin proposed in the driveway shall also connect to the storm detention system. Show the o point of connection on the plans. ok o 8.ok 9.ok 10.ok/ 11.Show the location of the meter at the property line and the water service line from the meter to the house. The water service line has only been shown from the house to the point at which the driveway meets the private drive. 4/19/07 comment - Show the location of the water service line from the meter to the house. Maintain 10’ o separation from the sanitary side sewer. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. DATE E-MAILED 7/30/07 PAGE 2 of 2