Loading...
2007-0264 Legend Structural Comments.doc Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Theresa Umbaugh 121 5th Ane N Edmonds, WA 98020 Re: Legend Estates Condo Bldg B 7803 218th St SW Edmonds, WA 98026 Plan Review # 2007-0264 EECE # EDM 08-05 Plan review number 01 Updated the comment letter to the IBC 2003, since this project was vested under the IBC 2003 and not the current adopted codes. Unit 1 Structure Stated Area S.F. First floor 112 Second floor 811 Third Floor 790 Total 1713 Garage 753 Total2466 Deck Second floor 75 Deck Third floor 75 Grand total 2616 Unit 2 Structure Stated Area S.F. First floor 103 Second floor 808 Third Floor 787 Total 1698 Garage 751 Total2449 Deck Second floor 85 Deck Third floor 85 Grand total 2619 Page 2 of 7 Plan Review Number 01 EECE#: EDM 08-05 Legend Estates Condo Bldg B 2007-0264 Unit 3 Structure Stated Area S.F. First floor 103 Second floor 808 Third Floor 787 Total 1698 Garage 751 Total2449 Deck Second floor 85 Deck Third floor 85 Grand total 2619 Unit 4 Structure Stated Area S.F. First floor 112 Second floor 811 Third Floor 790 Total 1713 Garage 753 Total2466 Deck Second floor 75 Deck Third floor 75 Grand total 2616 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back-check time. SCOPE OF REVIEW Page 3 of 7 Plan Review Number 01 EECE#: EDM 08-05 Legend Estates Condo Bldg B 2007-0264 Structural only The scope of this review is for therequirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Note engineer of record the drawings have information written in pencil and this must be in pen so it may not be erased. Please modify the drawings to have all information in pen. STRUCTURAL COMMENTS General 1.This building is not exempt from requiring complete structural analysis per IBC 2003. This analysis must be stamped by a licensed professional registered in the state of Washington. Please submit this upon response. All that was submitted was a narrative and not complete analysis as required per code. (Please note some check analysis will be done but a complete analysis is not done for the review process and should be submitted by the licensed design professional) 2.Please add to the requirements of IBC 1603. This clearly specifies what is required to be added on the construction documents. For example the Earthquake design data, wind design data, floor live data, etc. Please modify the construction documents accordingly. IBC 1603. 3.Design analysis submitted only applied the minimum wind load as per ASCE 7-02 6.4.2.1.1. ASCE 6.4.2. Based off the height and wind pressure the minimum 10psf appears not to control and the wind analysis per 6.4.2.1 will control. Please clarify upon the response. 4.Please add to the drawings a set of general notes stating what is being used for the materials. For example what is the required reinforcement, the concrete strength, wood stresses, etc? Without this information there is no way to complete the review. IBC 106 Sheet A8.00 Details 5.Engineer of Record, (EOR), please specify the required connection of the stair stringer on the drawings. I was unable to find where this information is specified. 6.EOR, provide analysis for the typical deck guard to support a 200 pound force applied at the top rails. The detail is not complete on how the railing will be Page 4 of 7 Plan Review Number 01 EECE#: EDM 08-05 Legend Estates Condo Bldg B 2007-0264 connected and the 2x2 spaced @ 10” appear not to be able to support this force. Submit engineering analysis to justify what is specified to be used.. Sheet S1.00 Foundation Plan 7.Architect of Record, (AOR), please resubmit analysis for the reinforcement steel to be of grade 40. There was not any foundation analysis in the submitted documents. Please submit this upon response. IBC 1801.2 IBC 1901.2 ACI 8.Per check analysis it appear the SW1 in the east-west directions will support the lateral forces as shown on the drawings. Submit analysis to justify. 9.Based off the length of the shear wall shown in the east-west direction will meet the minimum height to width requirements. Please submit analysis to justify. IBC table 2305.3.4 Sheet S2.00 Second Floor Framing Plan 10.EOR, please provide a detail for the connections of the 5-1/4 PSL to the 8x8 supporting post. Nothing is specified at this time. 11.EOR, please specify the required hanger to support the PSL beams. Nothing is specified at this time. 12.EOR, please provide a detail for the 8x8 post supporting the 5-1/4 and 5-1/8 beams. The post is 7.5” wide and the beam width is smaller then this. How is this member being positively connected? All post to beam connections should be specified on the drawings. Detail 7 will not work in this case when the post is wider then the beam 13.EOR, please provide a detail for the 4x8 post supporting 5-1/8 beams. The post is 3.5” wide and the beam width is wider then this. How is this member being positively connected? All post to beam connections should be specified on the drawings. Note detail 7 on sheet S6.01 specifies a post cap. Submit analysis for this cap. 14.The code does not allow (2) 2x to be used in place if 3x member unless double the amount of anchor bolts are used and the nailing does not require 3 X only. Please modify accordingly. IBC 2305.3.10 15.EOR, please specify the species of glu-lam on the drawings. And submit analysis to justify the glu-lam specified. Page 5 of 7 Plan Review Number 01 EECE#: EDM 08-05 Legend Estates Condo Bldg B 2007-0264 16.EOR, please specify the required diaphragm nailing for this level with analysis to justify. This also should include the plywood thickness and diaphragm nailing. IBC 2305.2, IBC 1620.4.3, ASCE 9.6.1.3 ASCE 9.5.5.2 17.EOR, please provide analysis for the cantilever 5-1/4X9-1/4 shown on the either end of the building. Partial load combinations should also be investigated for these members. ASCE 4.6 18.EOR, please provide analysis for the cantilever TJI floor joist shown on the either end of the building. Partial load combinations should also be investigated for these members. ASCE 4.6 Sheet S3.00 Third Floor Framing Plan 19.EOR, there is no information on either how the balcony will be supported or the analysis. Please submit this upon the response. IBC 1604.8.3 and IBC table 1607.1 20.EOR, please submit analysis for the PSL beams specified on this sheet. Also the drawing should specify the required connections. (Please note the drawings have the beams written in pencil, when resubmitting please have this written in ink so it may not be field modified) 21.EOR, submit analysis for the A35 @22”O/C to transfer the shear forces. This was not submitted as this time. 22.EOR, the SW 1 in the stair way does not meet the minimum height to width rations. Please submit analysis to justify. IBC 2305.4 IBC 2305.3.3 23.EOR, please specify the required diaphragm nailing for this level with analysis to justify. This also should include the plywood thickness and diaphragm nailing. IBC 2305.2, IBC 1620.4.3, ASCE 9.6.1.3 ASCE 9.5.5.2 Sheet S4.00 Roof Framing Plan 24.EOR, please specify the required diaphragm nailing for this level with analysis to justify. IBC 2305.2, IBC 1620.4.3, ASCE 9.6.1.3 ASCE 9.5.5.2 25.EOR, please note on the drawing the required design information for the trusses. This must be a deferred submittal and this information is required to be on the contract documents. IBC 106.3.4.2 Page 6 of 7 Plan Review Number 01 EECE#: EDM 08-05 Legend Estates Condo Bldg B 2007-0264 26.EOR, please submit analysis of the 11-7/8 TJI joist and specified the one to use. There are many different types of TJI joist. This should be specified on the drawings. 27.EOR, please specify the required post to beam connections. It was not clear how this will be constructed based off the submitted drawings. IBC 2304.9.7 and IBC 2304.9.6 28.EOR, please provide a details for the required connections of the interior shear wall mark SW1 at the stair framing. IBC 2304.9.6 29.EOR, please analysis and specify the required collector elements to drag the lateral shear forces into the vertical resisting elements. There is a shear wall with any method to collect the lateral diaphragm forces. Please add this information’s and provide analysis to justify. IBC 2305.1.2 30.EOR, please add to the drawings sheet G-1 as noted in the roof framing notes 7. There is not a sheet G-1. Sheet S5.00 Upper Roof Framing Plan 31.EOR, please specify the required diaphragm nailing for this level with analysis to justify. IBC 2305.2, IBC 1620.4.3, ASCE 9.6.1.3 ASCE 9.5.5.2 32.Based off the layout, the horizontal diaphragm appears it will not meet the required diaphragm ratios, please modify accordingly and clarify the vertical resisting lateral elements. IBC 2305.2.3. 33.EOR, please add to the drawings sheet G-1 as noted in the roof framing notes 7. There is not a sheet G-1. Sheet S6.00 Structural Details 34.Detail 6: EOR, please clarify where this detail is being used. Also please add the required “A” dimension as noted. Sheet S6.01 Structural Details 35.Detail 7: Detail state 4x8 shall be used but the plans state 4x6. Please clarify which will be used and justify by analysis. 36.Detail 4: EOR, please complete the nailing reference noted in the detail The detail state “NAILING PER DET X/SX.XX Page 7 of 7 Plan Review Number 01 EECE#: EDM 08-05 Legend Estates Condo Bldg B 2007-0264 37.Detail 10: EOR, please submit analysis for the A35 to resist the lateral loads of the manufactures truss supporting the horizontal diaphragm Please provide this information upon response. IBC 2305.1.4 ASCE 9.6.1.2 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President