2007-0276 SFR(2).pdf
City of Edmonds
TH
121 5 AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
Planning Building Engineering
Plan Review Corrections
Plan Check : Date:
# 2007-0276 August 2, 2007
th
Project Name/Address:
Jakes Development/7511 176 ST SW
th
Contact Person/Address/Fax:
Jakes Development/16430 6 Ave W Lynnwood, WA 98037/425-741-
7320/Fax: 425-741-7343/Cell: 206-387-6534/e-mail: jakesdevelopment@comcast.net
Reviewer: Jaime HawkinsDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed:
1.5/4/2007, Extend the sewer main eastward up to the proposed sewer lateral. 8/2/2007, please extend the
sewer main up to the proposed sewer lateral as requested. The sewer connection is to be done E6.4
2.5/24/2007, by installing the new curb/gutter 12-ft north from the edge of pavement the drainage ditch
will have to be filled. A new storm line shall be installed at the new gutter line, which will require the
installation of at least 2 new catch basins, one at east the other at the west, that shall be connected to the
existing storm ditch by installing a 12-inch storm pipe armored with 2-4 inch quarry spalls. Please show
the new catch basins, the 12-inch storm line connecting both catch basins, and the 12-inch storm line
with quarry spalls. Please make sure to provide invert and rim elevations for all pipe and structure.
8/2/2007, you are missing one to two invert elevations at the proposed m/hs. For example, the proposed
west manhole in the Right-of-Way should have 3-invert elevations, one for the 6-in line coming in from
the north, the second for the 12-in line coming in from the east and the third for the 12-in line exiting the
m/h to the open ditch.
3.5/4/2007, relocate existing mailboxes. 8/2/2007, please relocated and show the new location of the
mailboxes.
4.5/24/2007, the grading exceeds 500-cu-yds. Please contact the Planning Division for SEPA
determination. 8/2/2007, The grading quantities are in excess of 500 cu-yd. Please contact the Planning
Division for SEPA determination.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE MAILED: 8/2/2007 PAGE __1__ OF _1__