Loading...
20070301130822.pdfo,CEdmonds Eoo City of PLAN REVIEW COMMENTS '`-`° 4" BUILDING. DIVISION �'sr. t 890 (425) 771-0220 DATE: March 1, 2007 TO: Ralph Allen, Architect Bridge Architects FAX: 206-783-2037 FROM: Ann Bullis, Assistant Building Official RE: Plan Check #: 2006-1309 Project: Old Milltown Non -Structural Demolition Project Address: 201 5th Ave S. During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please provide written responses to each comment as to how it has been addressed (support with code sections where applicable), and where changes can be found on the plans. Please submit revised plans/documents to Theresa Umbaugh, Permit Coordinator. 1) Previous Item 3: As previously requested and discussed during meeting on site 1/19/07, provide evaluation report from structural engineer of record regarding structural integrity of the existing building/slab to support the proposed truck route through the existing building. 2) The demolition plans submitted under this permit application still show notes regarding Stage 2 and 3 structural demolition. Based on your letter received 12/18/06, the scope of work under this demolition permit is Stage 1 non-structural demolition only. A separate permit will be required for Stage 2 and 3 demolition. References to Stage 2 and 3 demolition work have been crossed out on the plans.