20070308104559.pdfDATE: March 8, 2007 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425)771-0220 TO: Mark Fowler SGA FAX: 206-547-0833 FROM: Ann Bullis, Assistant Building Official RE: Plan Check #2006-0991 Project: Third Avenue Plaza -- Reroof Project Address: 120 3`d Ave S During re -review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please submit written responses to each comment and revised plans/documents to Theresa Umbaugh, Permit Coordinator. The City has received the revised plans, including new sheets A2.2 and A3.0 showing "existing conditions". However, the items below were not addressed from the Building Division comments dated 1/9/07. Copy attached for your convenience. The bold italics comments were added for more information. 1. Previous item 2: • As noted in my previous comments and discussion with Mark Fowler of SGA, since the City has no record of this work as part of the original building construction, a permit must be obtained to legalize the work, including construction plans stamped and signed by a State licensed Architect or Professional Engineer, including dimensioned floor plans, roof plan, framing plans, construction sections, fire rated construction details, elevations, etc. The sketches submitted were incomplete and were not stamped and signed. Fire rated wall and roof -ceiling construction details/assemblies applicable to the revised construction were not included in the plans. This was also discussed at the 2/1/07 meeting. • Since the "roof deck" area is now enclosed, it appears that sleeping room egress and exiting may be affected. The architect shall review the impact that enclosing this area has on exiting, sleeping room egress, and other possible code issues, and include with the next resubmittal. This was not addressed on the plans, nor in the response letter from the architect, and was also discussed at the .2/1/07 meeting y of £neo CitV of Edmonds ti PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: January 9, 2007 TO: Luke Hagler Charter Construction, Inc. FAX: 206-382-0450 FROM: Ann Bullis, Assistant Building Official RE: Plan Check #2006-0991 Project: Third Avenue Plaza -- Reroof Project Address: 120 3rd Ave S During re -review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please submit written responses to each comment and revised plans/documents to Theresa Umbaugh, Permit Coordinator. 1. Previous item 2: • As noted in my previous comments and discussion with Mark Fowler of SGA, since the City has no record of this work as part of the original building construction, a permit must be obtained to legalize the work, including construction plans stamped and signed by a State licensed Architect or Professional Engineer, including dimensioned floor plans, roof plan, framing plans, construction sections, fire rated construction details, elevations, etc. The sketches submitted were incomplete and were not stamped and signed. • Since the "roof deck" area is now enclosed, it appears that sleeping room egress and exiting may be affected. The architect shall review the impact that enclosing this area has on exiting, sleeping room egress, and other possible code issues, and include with the next resubmittal. • To determine fees for the remodel work, submit a cost estimate from the architect for the work that was done. Should any additional work be required to alter the non -permitted construction for code compliance, please submit a separate contractor's bid.