Loading...
20070315084900.pdfEoo City of Edmonds gag,; PLAN REVIEW COMMENTS BUILDING DIVISION fisr 1 s9° (425) 771-0220 DATE: March 15, 2007 TO: Marko Liias Regal—homes@comeast.net FROM: Jenny Readwin, Plans E amine RE: Plan Check # 2007-0303 Project: Project Address: During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Provide stamped and signed calculations and details for both the concrete and keystone block retaining walls. 2) Clarify elevation of the driveway to show that a surcharge is not being placed on the keystone block walls along the driveway. If a surcharge is being place on the wall please have Engineering account for this in the calculations.