20070320102720.pdfODS City of Edmonds 0 Al PLAN REVIEW COMMENTS f BUILDING DIVISION 425 771-0220 DATE: March 20, 2007 TO: Dan Weller danielgweller@comcast.net FROM: Jenny Readwin, Plans Ex in RE: Plan Check # 2007-0224 Project: Carpenter Addition Project Address: 830 Bell St. During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Label the entry addition on the site plan. 2) Show location of existing and proposed smoke detectors on the floor plan. One is required in each sleeping room and in the hallway outside each separate sleeping area. 3) Specify if existing window in the den meets egress. The area marked "study" would appear to be a closet making the den a sleeping room. This room must meet egress and have a smoke detector. Please note on plans. 4) Provide typical stair detail showing rise, run, handrail, guardrail, headroom etc. complying with R311.5. 5) Provide calculations to justify ledger lag bolt size and spacing shown in detail 2/A2. 6) Provide roof framing information (ridge, rafters, trusses, etc.) for proposed covered porch. 7) Provide calculations to justify that larger posts and/or footings are not required under support #3 of Beam 10 (9046#). 8) Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. Special Inspector must be a Structural Engineer or a WABO certified inspector. • Epoxy Bolts/Holdowns S ' CITY OF EDMONDS �iSPECIAL INSPECTION AND TESTING AGREEMENT The project at Vim`' issued under building permit number requires special inspection and/or testing per IBC Chapter 17. The complete list of special insp ctions is attached to this document. BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis—meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention ofthe contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record.and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description of daily inspections and tests made with applicable locations • List of all non -conforming items • Report on status of non -conforming items (resolved or unresolved) * Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. S. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:ITEMPIBUILDINGISpecialInspectionAgreementIBC_doe 7104 4 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at -the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Buildin1l Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner Date Special Inspector Date General Contractor Date City Building Official Date L:ITEMPIBUILDING1SpeciallnspectionAgreementlBC.doc 7/04 s SPECIAL INSPECTION AND TESTING SCHEDULE( �J�F.CiTiR $t1IID9VCPERMLTNR - moIECF ADDRESS - TEST11413I iSPECTHM A(`vFJ3CY a SPECIAL DISPECIM REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: STRUCTURAL STEEL/WELDING: CoDa"e Gunite Groat Mir Sample and Test dist specific mamas below) . A&—gate Tests — Shop Material Identifimnort Reinforcing Tests ` Wilding inspection 13 Shop D Field Mix Designs � Ulua w& Inspection ❑ Shop D Field Reinforcing Placement — High-strength Bolting Batch Plant Inspection lnspeeaon O Sbop Cl Field Inspect Placirie D A325 Cast Samples D A490 [IN D X. OF Pick-up Samples Metal Deck Welding Inspection � Compression Tests _ _ Reinforcing Steel Welding Inspection Metal Stud Welding Inspection PRECAST/PRESTRESSED CONCRETE: — Concrete Insert( Welding Inspection Piles Post -Tries FYe-Tem Cladding AggrepteTests FIREPROOFING: Reinforcing Tests — PlaceroenrInspection Tendon Tau — Density Tests Mix Desim Thickness Tests Reinforcing Placement Inspect Batching Insert Placement Cancrctc Batching INSULATING CONCRETE: Concrete Placement — Sample and Test Installation Jiucpcnon — Placement Inspection Cast Samples ...._ Unit Weights Pick-up Samples Compression Tests FILL MATERIAL: MASONRY — Acceptance Tests — Placement Inspection — Spes W inspection Stresses Used — I=ield Density Preliminary Acceptance Tests fMasonry Units. Wall Prisms) Subsequent Tests (Mortar. Grout. Field Wan Prisms) STRUCTURAL WOOD. Placement Inspection of Units — Shear Wan Nailing I -vection — Inspection of Glu -lam Fab_ _.__ Inspection of Truss Joist Fab. ADDITIONAL INSTRUCTIONS OR OTHER TESTS ---- Sample and Test Components AND INSPECTIONS: Form completed by: Title: TcIcowne No.: Date: