20070327064252.pdf0'q City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION gst 1 g9 3 (425) 771-0220 DATE: March 27, 2007 TO: Valerie Sargent FAX: 206-349-7005 FROM: Ann Bullis, Assistant Building Official RE: Plan Check #2006-1344 Project: Point Edwards Building 9 Foundation Only Project Address: 45 Pine Street During re -review of the above noted project, it was found that the following items still need to be addressed. Please respond in writing to each item and include the locations) of the changes to the plans/documents, and cloud the changes made. Please resubmit 3 sets of plans/documents and written comments to Marie Harrison, Senior Permit Coordinator. 1. Submit revised architectural plans Sheets A2.0 and A2.1 (for reference only) to match structural plans showing the new location of the exit door to meet travel distance at the parking garage. (previous item #2) 2. Provide architectural plans addressing damp-proof coating at the foundation walls of the basement (IBC 1807.2). The structural response letter defers to architectural plans which were not submitted. (previous item 4) 3. As with past foundation plans, page 9 of the November 21, 2001 soils report requires prefabricated wall drainage system as well as foundation drains which need to be shown/addressed on the plans (IBC 1807.2). The structural response letter defers to architectural plans which were not submitted. (previous item 5) 4. The Special Inspection Agreement submitted addressed the geotechnical items and only the structural items (AAR inspection) for the shoring. Complete the enclosed special inspection and testing agreement for the remaining structural items for this project and have the owner, general contractor and AAR sign the form and return for City approval prior to permit issuance. (previous item 6) 5. Provide a written general contractor acknowledgement statement for this building per IBC 1705.3. (previous item 7) CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at issued under building permit number r 1:>41q f4p7 ;,requires special inspection and/or testing per IBC Chapter 17_ The complete list of special inspection�5 s�ttached to this document. BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector ]. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis—meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner small be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also he the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports roust include the following: Description of daily inspections and tests made with applicable locations • List of all non -conforming items Report on status of non -conforming items (resolved or unresolved) Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:!TEMPIBU1LDlNGISpeciallnspectionAgreemenilBC_doc 7/04 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities L Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at -the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building De artment Responsibilities I. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official xray issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been subniitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Enp_ineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner Special Inspector General Contractor City Building Official L.\TEMM-UJLDING1SpeciallnspectionAgeementIBC-doc 7104 Date Date Date Date SPECIAL INSPECTION AND TESTING SCHEDULE 0-40-4.-I -- P,1i-r-rcq�s ���i 9.. — 00 MC";Cr NAME BU11.b>z7[-PER►lt! NE) - M03EU ADDRE4 - wGFNCY Q SPfCJA1 tNSYECiDR REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: CENUTt" Gttttite Groat Menu Aggregate Tests Rtinforcing Tests -Mix Designs Reinfom-ing Placement Batcb Plant Ltspcxtion �Y Plac►n& Cast Samples Pick-up Samples Compression Tats PRECASTIPRESTRESSED CONCRETE: r sto rte-JtCfB rTo- ftAd A )tate`[ests Reinforcing Tests Tendon Tats Mix Desie"s Reinforcing Placement )aunt Plaremcm Concrctc Batching Cona-cte Placement Cast Tests MASONRY- - Special Inspersion stresses Used — Ptelimtnary Acceptance "Pests (Masonry Units. Wall Prisms) — Subsequent Tests (Mortar. Grout. Field wall Prisms) ____ Placement Inspection of Units STRUCTURAL STEEL/WELDING: _ Sampk aad Tat hist specific membra below) Shop Mab -tial Identifiicatioa weMin& bisPation ❑ Shop D Fiend — uivasonw Inspection OSbop ❑i-teld — High-swength Bolling Inspection 0 Sbop D Field D A325 DA490 DN DX OF — Metal Deck Welding Inspection j — Reinfoming Steel welding Lupenkm i — Metal Stud welding Istspcction — Concrete frtsert welding Inspection FIREPROOFING: Placement Inspection — Density Tests Thickness Tests Inspect Batching INSULATING CONCRETE: .,__. Sample and Test — Plaecmcnt Inspection — Unit Wcigbts FILL MATERIAL: — Acceptance Tests — Placement Inspection — Field Density STRUCTURAL WOOD: Shear wall Nailing IDspection Inspection of Glu -lam Fab. Inspection of Truss Joist Tab_ ADDITIONAL INSTRUCTIONS OR OTHER TESTS — Sampk and Test Components AND INSPECTIONS: Form compiacd by: _.Aw I / A k t 5 _, Talc. Telephone No_: _ '! ? ? c7Z'(r0 _ Date