Loading...
20070329145740.pdfof F1) City of Edmonds AI ` PLAN REVIEW COMMENTS BUILDING DIVISION �sr1 ago (425) 771-0220 DATE: March 29, 2007 TO: Michael Painter PO BOX 3203 Lynnwood, WA 98046 FROM: Jenny Readwin, Plans Ex ne RE: Plan Check # 2006-1303 Project: Culver SFR Project Address: 7217 Meadowdale Beach Rd. During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the above items to a Permit Coordinator. 1) 3/29/07Still need stairs off covered porch, window well retaining walls, setbacks, etc. Some information is missing from the site plan (i.e. covered porch, balcony, stairs, structure setbacks to property lines, height calculation box -including covered porch, any easements, etc.). See enclosed sample plot plan for minimum submittal requirements. 2) 3/29/07 Still need. Provide reduced plot plan scaled 1"=20' on legal size paper or smaller, that matches the large site plan for microfilming purposes. 3) 3/29/07 Response said they were not needed but rockeries are shown on sheet 2 of the sitelcivil plans. Please show top and bottom wall elevations at 2' intervals and per our handout because they are located in a critical area details stamped and signed by a Washington State Licensed Professional Engineer are required with corresponding design calculations also stamped and signed. Peer review may be required. It appears that rockeries or retaining walls will be needed on the site. Show location of any proposed rockeries or retaining walls. on the site plan with top and bottom wall elevations (see enclosed handout). 4) ok 5) ok. 6) ok 7) ok 8) 3/29/07 Provide stamped and signed detail and calculations for retaining wall as shown in detail C/A4. Provide window well detail including dimensions on the plan for Bedroom 3 complying with the requirements of R310.2. 9) 3/29/07 Still need. Provide letter from Geotechnical Engineer of record stating that they've reviewed the final construction plans and they are consistent with their report recommendations. 10) ok 11) 3/29/07 Still need. See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, PS PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 253 857-4151 Fax 253 857-5759 To: Edwin Balser 123 4th Ave. N Edmonds, WA 98026 Re: Culver Residence 7217'Meadowvale Beach Road Edmonds, WA 98020 PIan Review # 05-447 Strudure Area S.F. Lower floor 1164 Main floor 1956 Total 3320 Garage 792 Total 3912 Deck 410 Balcony 144 Grand total 4466 EECE # ED 05-60 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following commr tints, deficiencies/c6rrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -cheek time. SCOPE OF REVIEW The scope of this review is for the structural only requirements of this project. .All features were checked only to the extent allowed by the .submittals provided. All .portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before pciffi t approval. Project Name: Culver Residence Plan Review # 05-447 . Page 2 of 3 EECE # ED05-60 STRUCTURAL COMMENTS General 1. EOR analysis use and R factor of 7. Please clarify how this was determined. The walls are bearing walls and the R shall not be less than 6.5 if using simplified .method per IBC. ( 6 if using ASCE 7-02) Please clarify how this was determined. IBC table 1617.6.2 (Please note if using Gypsum to resist seismic forces the R must be 2.) map==* Sheet 3 3. Please modify continuous strip footing to be 18" and not 16" as stated as required per the geotechnical report. 4. Please justify 4X4 post at the glu-lain beam shown continuous. With a IIUCQ410 this :is where the column is continuous. Please clarify on the drawing which continue through, at this level. It is not clear as drawn or.specified. Sheet 5 5. Please provide details or the framing of the 2"d floor deck. All that is stated, is the member sizes. Are knee braces required at the column? How are the Iateral loads being transferred at this location? IBC 2304.9.7 6. Please provide detail and support framing for the Balcony. It appears the intent is to have columns, but they are not shown on the foundation plan. The required design force fora balcony is different then a deck. The required load shall be 60 PSF. Please submit analysis and details for how this is required to be framed. IBC table 1607.1 Sheet 6 7. Please clarify the beam call out at the covered deck specified as 3-118 X '/2 GLB. ,Sheet 8 S. Please provide detail on the drawing for the construction of the guards (guardrails). They are required to resist a 200 pound 10fizohtal force applied in any direction. IBC 1607.7.1 Sheet S 1 Page 3 of 3 EP -CE It ED05-60 9. Detail DI: Geotechnical report recommends the interior footing shall be place a Minimum of 12" below the finished grade. But this detail state 10". Please modify accordingly. 10. Detail D1: Geotechnical report state they recommend the strip footing to be a mimmum of 18" wide but this detail state 16". Please submit letter form Geotechnical engineer that as detail this is acceptable. 1.1. Detail M: Please specify the attachment of the blocking to the top plate. The analysis has assumed the top of the wall will be restrained in order to create the tension face on the inside face of the structure. A positive attachment is required at this location. Sheet S2 12. Shearwall table exceed the capacity set forth in table 2306.4.1. Please submit analysis for Shearwall mark W6G and W4G. Gypsum wall board and one side and plywood on other do not equal the sum of both capacities. See IBC 2305.3.8. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at .(253) 857-4151 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, PX. President