Loading...
20070382 Reichler Add (2).doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Application : Date: # bld20070382 August 15, 2007 th Project Name/Address: THE REICHER OFFICE BLDG / 21827 76 Ave W Contact Person/Address, Fax or E-mail: Ralph Allen / e-mail: rwallen@gracearchitectspllc.com Reviewer: Division:Engineering Jeanie McConnell During review of the re-submittal it was found that the following information, corrections, or clarifications will need to be addressed: Please resubmit 3 copies of the revised site plan to a Development Services Coordinator. 1.ok 2.Essentially a haul route plan is required. Please provide notes on the plan (redline okay) to indicate haul route. Comment 4/9/07 - Provide a traffic control plan for construction vehicular movement in and out of site. o 3.ok 4.Response letter states socks will be provided in CB’s. Please show the location of the CB’s and required filter sock protection on the plans. Comment 4/9/07 - Indicate what erosion control measures will be taken to protect the cb’s on site and on o th 76 ave W. 5.Fire Department comments dated July 26, 2007 note the requirement for a Fire Connection Permit. It is also stated that the Fire Connection must be submitted with the civil engineering plans. In reviewing the project file it appears there is not a set of civil drawings for this project. The information required for the Fire Connection can be added to the Site Plan with a separate detail sheet. The plans shall show all required valves, vault location, vault sizing, pipe size & material, etc. consistent with City standard details Comment 4/9/07 - Show the existing utililties to the building including the fire line. o 6.Refer to #5 above. 7.Sewer line adequacy must be determined at this time as all site improvement work will be approved under this permit, not the plumbing permit as referred to in the response letter. The location of the existing sewer line and pipe size needs to be shown on the site plan and the adequacy of the line size must be verified. Comment 4/9/07 - Verify the adequacy of the existing 6” sewer lateral and provide the necessary calcs for o review. DATE E-MAILED 8/15/07 PAGE(s) 1 of 2 8.The location of the existing water service and meter as well as the size of each shall be shown on the site plan. As noted, an RPBA with hotbox is required. Show the location of the hotbox/RPBA on private property immediately after the meter. Comment 4/9/07 - Verify the adequacy of the existing water service to the building and indicate if the o meter needs to be upgraded. 9.ok DATE E-MAILED 8/15/07 PAGE(s) 2 of 2