Loading...
20070405063843.pdf�o �a City of Edmonds 0 PLAN REVIEW COMMENTS BUILDING DIVISION a9° (425) 771-0220 DATE: April 2, 2007 TO: Mark Fowler SGA FAX: 206-547-0833 FROM: Ann Bullis, Assistant Building Official 9�7— RE: Plan Check #2006-0991 Project: Third Avenue Plaza -- Reroof Project Address: 120 3rd Ave S During re -review of the plans/documents for the above noted project, it was found that the following information, clarifications or changes are needed. Please submit written responses to each comment and revised pians/documents to Theresa Umbaugh, Permit Coordinator. I. In response to item #2 in the Architect's letter (undated) received by the City on March 15, 2007, the building is not equipped throughout with an automatic sprinkler system.. City archived plans for the existing sprinkler system show that only the upper floor is sprinkled, not the basement and main floor, therefore the building is not sprinkled throughout as specifically required in section 1025.1 exception 1. IBC 903.3.1.2 (NFPA-13R system) would only apply to Group R buildings four stories in height or less (see IBC 9033.1.2). This is a mixed use building containing occupancies other than Group R, therefore an NFPA-13 system would be required to Meet IBC 1025.1 exception 1. If the sprinkler system will be installed throughout the building, please contact the Fire Marshal for discussion of Standard NFPA-13 which would be required throughout a mixed use building, and contact Theresa Umbaugh, Permit Coordinator for permit requirements. Otherwise, code analysis by the architect is still required for exiting issues, since the "roof deck" area is now enclosed.