20070409081931.pdfDATE: April 9, 2007
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
TO: Jose Cadiz
cadizgc@comcast.net
FROM: Jenny Readwin, Plans EXMW
RE: Plan Check 4 2007-0228
Project: Huyer Addition/Remodel
Project Address: 7824 203" St. SW
During re -review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents (affected sheets only) with a written response to each of the items below to a
Permit Coordinator.
1) ok
2) ok
3) ok
„
4 4/9/07 Still need calculation for Proposed beam and show how all toads ,arecarried to
bearin&. 3/29/47 Note on plans says replace beam in attic as needed. Please specify size of
beam and provide calculations. This is not something our building inspector checks in the
field. It must be reviewed during plan review. Also, clearly show how all loads through the
over framed area are being carried to bearing. Provide a complete roof framing plan including
the existing house to verify that proposed wall to be removed is non-bearing. Also, note garage
framing and how the addition will be tied in.
5) ok
6) ok
7) ok.
8) ok
9) ok
10) ok
11) ok
12) ok
13) ok