20070409081931.pdfDATE: April 9, 2007 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Jose Cadiz cadizgc@comcast.net FROM: Jenny Readwin, Plans EXMW RE: Plan Check 4 2007-0228 Project: Huyer Addition/Remodel Project Address: 7824 203" St. SW During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) ok 2) ok 3) ok „ 4 4/9/07 Still need calculation for Proposed beam and show how all toads ,arecarried to bearin&. 3/29/47 Note on plans says replace beam in attic as needed. Please specify size of beam and provide calculations. This is not something our building inspector checks in the field. It must be reviewed during plan review. Also, clearly show how all loads through the over framed area are being carried to bearing. Provide a complete roof framing plan including the existing house to verify that proposed wall to be removed is non-bearing. Also, note garage framing and how the addition will be tied in. 5) ok 6) ok 7) ok. 8) ok 9) ok 10) ok 11) ok 12) ok 13) ok