RE: Plan Check # 2007-0355
Project: New SFR
Project Address: 8717 192nd Street SW
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents (affected sheets only) with a written response to each of the items below to a
Permit Coordinator.
1) Please add the following information to the site plan. Please redline plans or resubmit three (3)
new site plans scaled no smaller than 1 "=20' and one on paper no larger than 8 %Z" x 14".
■ Label the covered porch and covered terrace.
2) See attached structural comments from city consultant. Respond to each item in writing.
BJY Northwest
{ 1 architecture • Engineering • Planning • Government Services
l 6, 2007
Return Correction Notice & Plans to City of Edmonds Only
To: Mc Naughton Associates
2122112 th St NE Ste. A-100
Bellevue, WA 98004
425.455.4304
Contact person: Helleren Homes
Phone: 425.775.2651
Fax: 425.218.8097
Re: Project Description: 1 SFR With Attached Garage
PLAN CK # 2007-0355
Structure Level
8717192 ND ST SW BJY# 030731-007
Occupancy Cons't. Type Area S.F
SFR
Level 1 R3 TYPE VB
Level 2 R31U TYPE VB
2014
1800/336
The above referenced project is in the process of plan review for compliance with
The City of Edmonds ordinances and applicable codes (Structural). The following
comments, deficiencies/corrections must be addressed prior to completion of.
plans review and subsequent issuance of permits.
Provide revised plans and calculations along with a written response to each of the
items listed below to facilitate a shorter back -check time.
SCOPE OF REVIEW
The scope of this review is for the ordinance, structural and energy portions of this
project.
All features were checked only to the extent allowed by the submittals provided.
All portions of this project are assumed to meet or will meet other departmental
requirements, conditions and concerns before permit approval.
GENERAL COMMENTS
1
STRUCTURAL COMMENTS
CALCULATION
1. Page 1.1., Simplified wind load method can't be used because of the
irregularity shape of this building plan per IBC section 1609.6.1.1. #5.
2. Page 4.2, Please recheck the shear wall aspect ratio for the shear wall line
1 that is only 1.75 ft long (from calculation page 4.2), and reduce the
shear wall capacity accordingly per IBC table 2503.3.3.
3. The plan is with re-entrant corner irregularity (L shape) per IBC table
1616.5.1.1. Please provide diaphragm design to make sure the
maximum diaphragm dimension ratio is within code limit per IBC table
2305.2.3. Provide design, detail and calculation for each diaphragm
chord, collector, blocking, strap, please indicates the assumed
diaphragms in plans. An increase of 25% is required in the calculated
design forces for connections of diaphragms to collectors and vertical
element per ASCE 9.5.2.6.5.1
DRAWINGS
4. General -- Fasteners for preservative -treated and fire -retardant -treated
wood shall be of hot -dipped zinc -coated galvanized steel, stainless steel,
silicon bronze or copper. Coating weights for zinc -coated fasteners shall
be in accordance with ASTM A153. Reference Section IBC
Sec.2304.9.5 & IRC Sec. 319.3
5. Sheet # 3, Please specifies the 3X member for sill plate and framing
member receiving edge nailing with staggered nailing for those shear
walls has design value exceed 350 PLF (ASD), such as wall line 2 level
1 v=516 PLF from calculation page 4.2, per IBC table 2306.4.1.
6. Sheet # 6, HDR -9 Garage header 5 118 X 16'/ and FB -4 are supporting
discontinuous shear wall from above. In the event of an earthquake,
these beams have to take compression and tension couple coming from
the shear walls. Please recheck the adequacy of these beams with
combined seismic and gravity load per IBC 1620.2.9.
7. Sheet # 9, Section shows bottom of footing below the undisturbed ground
surface is less than 12 °, which is in conflict with IBC section 1805.2.
Please clarify.
Additional corrections may be required following receipt of corrections and additional
information as requested.
Your plans are being reviewed concurrently with the Building Department, Fire
2
C
Department, Zoning Department and Public Works Engineering. Changes, clarifications
or additional corrections may be required subsequent to the Building Department plan
review when comments are received from the other concerned departments.
Should you have any inquiries regarding this letter, please contact BJY at
(206) 264-8400 between 8:00 amand5:00 pm.