During re -review of the above noted application, it was found that the following information, corrections, or
clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected
sheets only) with a written response to each of the items below to a Permit Coordinator.
1) ok
2) ok
3) ok
4) ok
5) ok
6) ok
7) ok
8) ok
9) ok
10) ok
11) 5/2/07Plans do not match calculations submitted. Please revise plans to match calculations.
According to the top and bottom wall elevations on the site plan and retaining wall plan on sheet 3 at
one point the wall exceeds 4'. Please provide calculations from Engineer of Record for proposed
retaining wall. if grades are revised to remain under 4' please revise reinforcement schedule to
reflect only 4' wall (i.e. cross off 4'-6' and 6'-8' walls) and change topography and top and bottom
wall elevations accordingly.. Engineer of Record to provide detail and calculations for site retaining
walls. Detail provided is for a top restrained retaining wall. Provide detail call out for new wall on the
site plan where wall occurs.
12) ok
13) 5/2/07 Form still needs to be signed bv the owners. Still need. Special inspections are required for the
following. Complete the enclosed special inspection agreement signed by the owner, the general
contractor and the special inspector and submit to the City for approval prior to issuance.
• Soil Bearing Verification
• Excavation/Grading/Site Preparation including temporary cuts
• Placement of Fill and Compaction including foundation wall backfill
• Temporary shoring if required
• Subsurface drainage installation including foundation drainage and under slab drainage
• General site monitoring by Geotech of Record
• Temporary and final erosion control