20070510155934.pdfOF neo City of Edmonds _PLAN REVIEW COMMENTS BUILDING DIVISION Esr. tag° (425) 771-0220 DATE: May 10, 2007 TO: Martin Reimes Fax 425-377-8783 FROM: Jenny Readwin, Plans E ine RE: Plan Check # 2007-0246 Project: White Addition/Remodel Project Address: 831 Northstream Lane. During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. Site Plan 1) -ok 2) ok 3) ok 4) ok General 5) ok Upper Floor PIan Sheet A2.1 6) ok 7) ok. 8) ok 9) ok 10) ok Lower Floor Plan Sheet A2.2 11) ok 12) ok 13) ok 14) ok Sheet A4.1 15) ok 16) ok 17) ok. 18) ok 19) ok Sheet A5.1 20) ok. 21) ok 22) ok Sheet A5.2 23) 5110107Still need especially on sheetA5.3 at the loft to clarify what beams are hanging, which are supported on posts/multiple studs and to verify spans. Please clearly show all this information on the plans. Show all posts, multiple studs and/or hangers on the framing plans to verify spans and how all loads are carried to bearing. Please also add this information to A5.3. Additional plan review comments may follow once this information is provided. 24) ok 25) 5/10/07 These beams do not line up with the footings on the foundation plan. Please clarify. Clarify how the 4x10 beams at the proposed entry are carried to bearing. 26) ok 27) 5/10/07 Still need calculations to justify footings supporting these beams. Provide calculations to justify that larger posts and/or footings are not required to support 2B04, the exterior side of 2B08 and 2801. Sheet A5.3 28) ok Sheet S-2 29) ok 30) 5/10/07 Will need special Inspection form before permit is issued. Provide calculations for expansion anchor size and spacing attaching the ledger to the foundation wall. Special inspections are required for expansion anchors. Complete the enclosed special inspection testing agreement signed by the owner, general contractor and special inspector. Special inspector must either be a Structural Engineer or a WABO certified inspector. Page 2 of 2