20070511115536.pdfDATE: May 11, 2007 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Tom Leren tom@ierendesign.com FROM: Jenny Readwin, Plans Exa ine RE: Plan Check # 2006-1245 Project: Zorchenko SFR Project Address: 8910 178"' PI SW During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) ok 2) ok 3) ok 4) ok 5) ok 6) ok 7) ok 8) 5/11/07 Since this area is unheated door to residence must be exterior rated and weather-stripped. Note on plans. Also note R-21 wall insulation on wall by stairs and media room. Specify if the wine cellar will be heated. 9) ok 10) ok 11) ok 12) 5/11/07 Form was submitted signed by the owner. Before permit issuance form must be signed by special inspector and general contractor. Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. • Excavation, grading, & site preparation • Soil bearing verification • Placement of fill & compaction • Footing drain • Temporary Erosion Control • Final Erosion Control • Site retaining wall/ rockery construction. • Temporary Shoring if required (separate permit required) 13) 5/11/07 see attached additional comments. See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 . Olalla, WA 98359' hoytjeter@pbnturytel.net 360 874 0562 Fax 360 874 0591 To: JoAnne Zulauf 121 5th Avenue N EdmoAds, WA 98020 Re: Zorchenko Residence and Cantilever Retaining wall 8910178th Place SW Edmonds, WA 98020 Plan'Review # 2006-1245 2nd Comment Letter Mondays May 07, 2007 EECE # EDM 06-65 (2) Structure Stated arca S.F. Lower Floor 984 First floor 2491 Second floor 2004 Total 5479 Garage 931 Total 6410 Peck 440 rand total 6850 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural Only requirements of this project including the concrete retaining wall. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 3 EECE4: EDM 06-65 (2) Zorchenko Residence (2006-1245) STRUCTURAL COMMENTS Site Plan: 1. Please provide a detail for the ECO -block wall noted on the site plan. All that is noted is per shoring plan. This was not submitted. l5 /16 k_ 0/�of- P&n t. r6 pet"et M,,qA79V 6ei' rw Sheet 4 FOUNDATION PLAN: 71vCBm,-,u Y rl -{ s�a etc? 2. 1. The geotechnical report states that the minimum depth of the perimeter footing shall be 24" below finished grade. Please modify the drawings to state the 24" square footing shall be 24" below grade and not I8" as recommended by the geotechnical engineer. Alternative submit letter form the geotechnical engineer to justify 18 ". Page 7 of the report. The response states the drawings have been changed but the new drawings still does not state 24" as required per the submitted geotechnical report. Sheet 8 MAIN FLOOR FRAMING: 3. Engineer of Record (EOR), the beams specified on the drawings do not match the new analysis submitted. Provide an analysis for the beams specified on the new/revised drawings. 4. 10. EOR, please provide a detail at the corner of the opening in the diaphragm. This is at the 3-1/8X13-1/2, diagonal double joist, 1-3/4 X 9-1/2 LVL and diagonal 1-3/4 X 9-1/2 LVL. It is not clear how these members will be connected in order to transfer the vertical loads. Please add this information to the drawings. The new detail states the bearing support for the glu lam beam at the 6x6 post to be 2" by the beam width. Submit an analysis for this to support the design loads. Based off the submitted analysis of the beams the reactions will exceed the allowable bearing stress. Please modify accordingly. NDS 3. 10. 5. 12. EOR please provide a detail for the connections of the 5-1/2 PSL flush with the floor and 5-112X9-112 under the floor . How are these beams being supported? Please provide a detail at these locations. The response states a detail has been added. This detail is detail A: All that is noted (3) 2x4 at locations and (5) 2x4 at the other. Submit an analysis showing the allowable bearing will not be exceeded at this location. NDS 3.10 6. EOR please provide analysis for the double stud to support the 6x10. THe 6x10 also support the 5-1/8X18 GLB. 7. 13. EOR, please provide a detail at the column 48 supporting the 5-118X21. How is the beam being connected to the post? The post width is 7:5 and the beam 5-1/8. A positive connection is required to be added at this location. For some reason the Page 3 of 3 EECE#: EDM 06-65 (2) Zorchenko Residence (2006-1245) beam sizes specified on the drawings have changed from originally submitted, but the analysis specifies larger beams. Please either re -submits an analysis for the new beams specified on the drawings or modifies the drawings to match the analysis. The beams specified on the drawings are not conservative based off the required analysis for the beams. Sheet 11 BUILDING CROSS SECTION & DETAILS: 8. 14. Detail G. Geotechnical report state the minimum depth to bottom of footing shall be 24 ". Please modify accordingly. This still has not been modified as per the geotechnical report. For example: 6"+8"+2"=16" not 24". The "E" in the footing schedule shall be a minimum of 14" in order to meet the geotechnical recommendations. 9. EOR, the design analysis appears to imply T bars shall be horizontal on the top of the footing as shown on the drawings but also on the bottom of the footing, T bars are required running in the other directions. Please modify the retaining wall to match the analysis submitted or clarify the submitted analysis. 10. Detail G. Please specify the reinforcement on the drawings for the key as required per the design. Nothing is specified at this time. Sheet 12 DETAILS: 11.18. Detail D: Please speck the maximum height not only the minimum in order to check the connections and the 4x4 post. All that is stated in 3' minimum. Please specify the maximum height of the deck. It still states minimum. To assure the guardrails do not exceed the design requirements please add the maximum height. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. LIM Hoyt Jeter, P.E. President